My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:11:23 PM
Creation date
5/7/2020 3:04:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A fi <br /> C D E F � <br /> REYIBION DEBCRIPT€ON 9Y APP DATE <br /> POWER <br /> PULL BOXINSTALL PULL BOXES <br /> PER DWG E-3 <br /> INSTRUMENTATION DETAIL "C' <br /> PULL BOX <br /> P i 201 20 <br /> Uo aoa z a <br /> UNDER COUNTER <br /> 30t I( INCUBATOR <br /> a a WALL MOUNTED <br /> GHT FIXTURE 'D' <br /> ATS/ PDP Cp FUME <br /> LPA "AM' HOOD REST <br /> ROOM EU <br /> INSTALL ENCLOSURE <br /> CONTROL/ELECTRICAL ROOM e <br /> d �iF13 <br /> CONCRETE PAD <br /> a, <br /> PER DWG E-3 LABORATORY DETAIL 'A" <br /> BLOWER 113 <br /> n ROOM C <br /> DESK 011 9 j xEi,2 bBLOWER <br /> 0A � A BLOWER BLOWER <br /> %b cd A f 93 02 <br /> 3 3 012 f (FUTURE) 4 <br /> CP ab 1 d c BENGH _h <br /> 'AM' 3 3 <br /> ZS <br /> 03 l 1 2S B ZS <br /> 014 AC/HEAT 014 h 3 <br /> ELECTRICAL LIGHTING PLAN ELEVATION <br /> NOTE: I. PROVIDE NECESSARY 012 WIRES IN EMT CONDUIT FOR SCALE: 1/4' SCALE: 1/4" 1'-D" <br /> LIGHTING CIRCUIT ARRANGEMENT AS SHOWN. <br /> 2. HOMERUNS SHALL BE PROVIDED FOR ALL PANEL LPA CIRCU€TS, <br /> POWER DISTRIBUTION PANEL-PDP- <br /> PER DWG E-12 3 <br /> AUTOMATIC TRANSFER SWITCH _ <br /> &LIGHTING PANEL'A' CONTROL PANEL'AM' <br /> PER DWG £-12 PER OWG E-12 <br /> PLUG STRIP OVER COUNTER <br /> 5" BASE WITH 5 RECEPTACLES <br /> FROM GFl BREAKER <br /> HUBBEL P75112 OR APPROVED EQUAL <br /> (FEO FROM GFI BREAKER) z <br /> OWATER HEATER OUTLET FOR 1/6 HP VACUUM PUMP <br /> LOCATED UNDER SINK O 48' WITH ON/OFF SWITCH LOCATED IN LAB JUNCTION BOX <br /> 08 <br /> FOR FUME HOOD <br /> 5(J! --� 05 <br /> --TOO o4TS PDP CP J J _ - 0 �-- ---- BLOWER ROOM — <br /> S I IPA 'AM" FiJE8 <br /> C 41-d HOOD - GFl i BLOWER 03 BLOWER 2 BLOWER F - <br /> /, HOOD ~ �_ ) 1 0 i CAP CONDUIT <br /> 00 06 `� {FUTUREWTH PLUG <br /> tot! 1 �1 4D 015 0t9 218 & T REST ROOM 02J 022 FLUSH PATH FLOOR WALL CABINETS <br /> F a' TO 010 GND <br /> 00 I � 00 TO <br /> NDER COUNTER i €NSTALL PER <br /> DWG E-3 TELEPHONE; f <br /> MAIN SMTCHBOARD 'MS- € coNTROL/ LABORATOR CU6 ATOR DETAIL 'E' JACK `LT / f <br /> P1;F1 DWG E-12 I IDESK ELECTRICAL <br /> ` •�- -- k422 _ PLUG STRIP III HFUMEOOBr r r RECEPTACLE <br /> 1 1 I WORKS OP GF1 <br /> I I 2 t1 f 0 <br /> I 3 'AM" ` TO Q 21 !2 O UNDER 18 <br /> UFTTR GROUND OD TLETS TO BE ` 'POP' OF $ 2 COUNTER <br /> €NSTALL PER DWG E-3 I I • MOUNTED ABOVE 1 R <br /> DETAIL'D' _ f�'d� 00 BASE CABINET TO CONTROLS INCUBATOR L___j <br /> I I 024 015 01,3 020 BENCH 'PDP'�`_ CONTROL <br /> PANEL 'AB' <br /> 11 <br /> TELEPHONE I J 021 022 Q TQI <br /> BAMOARO <br /> 3/4' PLYWOOD �a <br /> FUTURE <br /> PAINTED GREY AC/"EAT <br /> MOUNT CKT 024 BLOWER SINK BASE STORAGE 5� <br /> RECEPTACLE CONTROLS RECEPTACLE BELOW <br /> CABINET Q 4p�SSI <br /> C y9 <br /> FOR INCUBATOR O l <br /> 230V, 10 STUB &CAP CONDUITS <br /> ON BACKBOARD <br /> RECEPTACLE PLUGS 06 JUNCTION BOX <br /> OVER BENCH, rte., <br /> FOR AC/HEAT UNIT 5' BASE WITH 5 RECEPTACLES FOR WATER HEATER <br /> 02. 4 � NO.�e4D � <br /> ON 12' CENTERS -K <br /> ELECTRICAL POWER PLAN (FEDHUBF M GF1 OR APPROVED EQUAL LAB/BATH ELEVATIONS <br /> (FED FROM GFI BREAKER) <br /> �fFOF Ctti1.�E��� <br /> NOTE: 1. PROVIDE NECESSARY 012 WARES IN EMT CONDUIT FOR SCALE 1/4' Q 1'-D' SCALE: 3/8' 1`-0" <br /> RECEPTACLES CIRCUIT ARRANGEMENT AS SHOWN. <br /> 2. HOMERUNS SHALL BE PROVIDED FOR ALL PANEL LPA CIRCUITS. THIS DRAWING 15 REDUCED ^ 3123 BROADIFAY <br /> I. INSTRAN TO <br /> EACH TELEPHONE JACK WITH TELEPHONE CABLE SACRAMENTO, CA 05817 <br /> FILES 9404C-E5 RAN TO TELEPHONE BACKBOARD. TO HALF SIZE <br /> eCALE DATE 'r E, 916-457-0144 <br /> NONE AUQUST 1004 ��1 zKv $�*� DEWANTE AND STOWELL FLAG CITY DRAWN1q NUMBER SHEET RUMBER <br /> pU REOOMMENOEO CONSULTING ENGINEERS SAN JOAGUIN OO„ CALIFORNIA CONTROL BUILDING <br /> CFEDKED FiLV APPROVED eAoaAMENTo, CALtl•ORMA WASTEWATER TREATMENT FACILITIES LIGHTING & POWER PLAN E-5 35 OF 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.