iG4. 02 Clarification of Contract Documents. Should it appear that <br /> the work to be done, or any of the matters relative thereto , <br /> are not sufficiently detailed or explained on the contract <br /> drawings or in the specifications, or in the event of any doubt <br /> or question arising respecting the true meaning of the <br /> specifications, the Contractor shall apply to the Engineer for <br /> such further explanations as may be necessary and the <br /> Engineer ' s decision shall be final and binding . <br /> G4. 03 Changes . The Agency reserves the right to make such <br /> —mod-i-Jications or alterations, reductions or omissions, extra or <br /> additional work to the specifications and contract drawings , <br /> including the right to increase or decrease the quantity of any <br /> item or portion of the work or to omit any item or portion of <br /> the work , as may be deemed by the Engineer as necessary or <br /> advisable , and to require such extra work as may be determined <br /> by the Engineer to be required for the proper completion or <br /> construction of the whole work contemplated. All changes shall <br /> be considered a part hereof and subject to each and all of its <br /> terms and requirements. <br /> No change or deviation from the contract drawings or <br /> 1 specifications shall be made by the Contractor without written <br /> authorization from the Engineer setting forth a complete <br /> description of the change. <br /> G4 . 0 Use of Completed Portions The Agency shall have the right at <br /> any time during the progress of the work to take over and place <br /> in service any completed or partially completed portion of the <br /> work , notwithstanding the fact that time for completion of the <br /> entire work or such portions may not have expired; but such <br /> taking possessions thereof shall not be deemed an acceptance of <br /> any other portions of the work, nor work on those portions not <br /> completed in accordance with the contract documents. <br /> G4 .05 Effect of Inspection or Use . Neither the inspection by an <br /> inspector or by the Engineer , nor any measurement, approved <br /> modification, order , or certificate, nor acceptance of any part <br /> or whole of the work or payment of money, nor any possession or <br /> use by the Agency or its agents, shall operate as a waiver of <br /> any provisions of the contract or of any power or authority <br /> reserved therein, or to any right to damages thereunder ; nor <br /> shall the waiver of any breach of this contract be held to be a <br /> ' waiver of any subsequent or other breach. <br /> G4. 06 Effect of Extension of Time The granting of an extension of <br /> time for the completion of the work on account of delays , <br /> avoidable or unavoidable, or for the execution of extra or <br /> additional work , shall in no way operate as a waiver on the <br /> ' part of the Agency of any of its rights under this contract. <br /> G-13 <br />