My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013206
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
16000
>
2600 - Land Use Program
>
PA-2000078
>
SU0013206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 3:11:31 PM
Creation date
5/7/2020 3:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013206
PE
2635
FACILITY_NAME
PA-2000078
STREET_NUMBER
16000
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20923002
ENTERED_DATE
5/1/2020 12:00:00 AM
SITE_LOCATION
16000 W SCHULTE RD
RECEIVED_DATE
4/30/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project r l <br /> 1 . The project site is located within unincorporated San Joaquin County , within the City of <br /> Tracy ' s Sphere of Influence ( SOI ) , and adjacent to the current City of Tracy limits boundary . <br /> 2 . The physical project is anticipated to include placing asphalt on the driveway , placing <br /> approximately 271 , 200 sf of gravel road surface for parking and circulation drives . <br /> 3 . Temporary security parking lot lighting will be installed and will be powered by either solar or <br /> a generator power source . <br /> 4 . Entitlements for the project will include : <br /> a . Improvement Plan application with San Joaquin County <br /> It is anticipated that no environmental review will be required under the California <br /> Environmental Quality Act ( " CEQA" ) . This project constitutes a " [ m ] inor temporary use of land <br /> having negligible or no permanent effects on the environment , under the Minor Alterations to <br /> Land categorical exemption of CEQA Guidelines section 15304 . In addition , this project is <br /> statutorily exempt from CEQA as an Emergency Proejct per CEQA Gudielines section 15269 ( c) <br /> because it qualifies as " [s ] pecific actions necessary to . . . mitigate an emergency . " <br /> 4 . The project will be developed in one phase . <br /> COSTCO PROJECT DESCRIPTION : <br /> Costco Temporary Truck and Trailer Parking Site Plan <br /> The project is in response to the increasing need for additional trailer parking to meet Costco ' s <br /> current distribution demand caused by the current Covid Virus pandemic . The Costco Tracy Depot <br /> distribution center is located at the corner of International Parkway and Schulte Road approximately <br /> 1 mile to the west of the subject vacant parcel on Schulte Road . Currently the Costco Tracy Depot <br /> Distribution facility is being expanded and portions of that project where trucks and trailers are to be <br /> parked are either under construction or have yet to be constructed . This project would help to <br /> alleviate the current parking shortage in this high - demand time by providing parking for up to <br /> approximately 200 Costco trailers . A new entry and driveway apron will be constructed to the <br /> temporary parking lot . The new parking lot entry will be approximately 450 ' west of the existing <br /> signalized intersection at Bud Lyons Road and Schulte Road . A 1904eet asphalt entry apron off of <br /> Schulte Road will allow for dirt to track off the truck tires prior to leaving the parking lot . Trailer <br /> parking will be located along the perimeter of the lot , with a double row of trailer parking down the <br /> middle of the lot . Trailer parking stalls will not be stripped due to the gravel surfacing . The parking <br /> lot has been designed to allow for a 72 ' truck and trailer combination to circulate the site . <br /> Security will be provided by Costco personnel or a security firm 24/7 while the site is being utilized . <br /> Temporary security lighting will be used on site and will consist of trailer mounted lights similar to <br /> freeway construction fixtures and will either be solar or generator powered . The temporary truck and <br /> trailer parking is expected to be used for up to 6 months . <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.