Laserfiche WebLink
r <br /> SITE SPECIFIC HEALTH AND SAFETY .PLAN <br /> 1. INTRODUCTION <br /> This document describes the health and safety procedures for the <br /> activities planned in performing the monitoring wells <br /> removal/destruction at 18755 Tom Paine Road, Tracy, California <br /> 95736 . All personnel and subcontractors will follow this plan. <br /> The prime responsibility for employee safety lies with each company <br /> that is involved in the work for it's own employees. It is. <br /> . expressly intended that all project work will comply with <br /> applicable sections of the California occupational Health and <br /> Safety code. All parties working on this project will maintain a <br /> general responsibility to identify and correct any health and <br /> safety hazards and are responsible for working in a safe manner. <br /> All personnel workers or visitors, will read and sign_ this <br /> document Rrior to coming on site. <br /> 2 . PERSONNEL RESPONSIBILITY <br /> Project personnel who will have ov.eraTl responsibility for the safe <br /> operation of this are: <br /> Site Contact: John N. Alt, CEG. (510 ) 791-1986 <br /> Project Manager: John P. Cummings (510 ) 505-0722 <br /> Site Safety officer: John P. Cummings <br /> 2. 1 Project Manager and Safety Officer Responsibilities: <br /> * To conduct initial site safety training for all ,project <br /> field personnel as described in this document and <br /> ascertain that field personnel have the appropriate OSHA <br /> approved training and medical surveillance per 29 CFR <br /> 1910 . 120 <br /> * To assure all field personnel have read, understand and <br /> signed the Health and Safety. Plan <br /> * To assure that all work performed- on this project is <br /> conducted in a safe manner` <br /> * To coordinate with field personnel fire-watch, traffic <br /> 1 <br />