Laserfiche WebLink
1 � <br /> " II <br /> EXPLANATION <br /> • <br /> A B-30 Proposed soil boring <br /> -30 SIERRA <br /> Note: Ground waterJlow direction tidally <br /> influenced <br /> 7 B-29 <br /> gas <br /> pumps <br /> O _ _ <br /> O <br /> OQ B-17 B-28 <br /> gas pumps QQ AB-18 B-19 <br /> Q `E----Aboveground <br /> B=16 <br /> % fuel tanks <br /> B-20 <br /> B-21 A <br /> B-27 <br /> B-22 <br /> B-26 / <br /> B-23 / <br /> '. N <br /> B-25 <br /> 0 300 ft. <br /> ,-,.a. �... .. B-24 <br /> Figure 3. Proposed Soil Boring and Grab Groundwater Sampling Locations -Tower Park Marina. <br /> 14900 West Highway,12. Terminous. California <br />