Laserfiche WebLink
LAW/C"ALL, INC: A geotechnical, environmeM4&construction materials consultants <br /> t e Suite 0 1San Rafael California 94903 Phone 415 499-1422, Fax(415)499-8419 <br /> . 4000 Civic Center Drive, 3 5 ( ) <br /> Los Angeles A Anaheim A 'Marina del Rey A Phoenix A Riverside A San Diego A Seattle <br /> March 4, 1993 MAR 8 1993 <br /> Mr. Philip S. Isorena ENVIRONMENTAL HEALTH <br /> Sanitary Engineering Associate <br /> Central Valley Regional Water Quality Control Board <br /> 3443 Routier Road <br /> Sacramento, CA 95827 <br /> Subject: Schedule'for ReMAKIhIng Workplan Tasks <br /> Tower Park Marina, Lodi, California <br /> Law/Crandall Project No. 2123-20662-1 <br /> Dear Mr. Isorena: <br /> This letter provides a tentative schedule for the remaining tasks described in Law <br /> Envronmental's Revised Tower Park Marina Workplan dated August 7, 1992. <br /> REMAINING TASKS SCHEDULE <br /> 1) Clarification of Technical Conditions 3/1/93 - 3/14/93 <br /> in Reclamation District Permit #548 <br /> 2) Remaining Piping Trench Sampling and Soil 3/15/93 - 3/28/93 <br /> Sampling/Monitoring Well Installation <br /> 3) Interim Remedial Actions (installation of trenches) 3/29/93 - 4/5/93 <br /> 4) Free Product Recovery Evaluation 4/5/93 - ongoing <br /> 5) Laboratory Analysis 3/29/93 - 4/12/93 <br /> 6) Reporting 4/12/93 - 5/10/93 <br /> We_ have_ spoken with Mr. Tom Rosten regarding our technical conditions in the <br /> Reclamation District #548 Permit. We will write a letter confirming Mr. Rosten's � <br /> clarifications by March 14, 1993. The interim remedial actions, if necessary, will be <br /> implemented based on the findings of assessment tasks. If the implementation of the <br /> remedial actions requires more time than scheduled, a revised schedule will be prepared. <br />