My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
14900
>
2900 - Site Mitigation Program
>
PR0009023
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:37 PM
Creation date
5/7/2020 3:57:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009023
PE
2960
FACILITY_ID
FA0004091
FACILITY_NAME
TOWER PARK MARINA
STREET_NUMBER
14900
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05503015
CURRENT_STATUS
02
SITE_LOCATION
14900 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' S ECOR - --- <br /> ' Mr. James Barton <br /> January 22, 2003 <br /> Page 4 <br /> ' ❑ A discussion of the quarterly groundwater monitoring procedures and results for the Fourth <br /> ' Quarter 2002. <br /> ACTIVITIES CONDUCTED DURING THE FOURTH QUARTER 2002 <br /> ❑ Groundwater monitoring and sampling was conducted on December 17, 2002; and <br /> ❑ Marina personnel continued to monitor well MW-3 for the presence of free-product. <br /> ' GROUNDWATER MONITORING <br /> On December 17, 2002, SECOR sounded five groundwater monitoring wells (MW-1 through MW-5) <br /> ' using an electronic water-level indicator graduated to 0.01 feet. The depth-to-groundwater was <br /> measured in each well and recorded on the water sample data Feld sheets included in Appendix A. <br /> The water-bevel indicator was rinsed with deionized water between the sounding of each well to <br /> ' minimize the potential for cross contamination. <br /> In accordance with the revised MRP, the sampling plan for the Fourth Quarter 2002 is shown on the <br /> table below. <br /> NQ1 Q2 Q3 04 <br /> MW-1 NS NS NS NS <br /> ' MW-2 NS NS TPH /TPHd NS <br /> MW-3` TPH /TPHd TPH /TPHd TPH /TPHd TPH /TPHd <br /> MW-4 TPH /TPHd TPH /TPHd TPH /TPHd TPH /TPHd <br /> MW-5 NS NS NS NS <br /> Sample well MW-3 only if no free-product is present. <br /> NS—Not Sampled <br /> ' Prior to sampling, wells were purged of approximately three casing volumes of water using a <br /> dedicated disposable PVC bailer. During purging, pH, electrical conductivity, oxidation-reduction <br /> potential, total dissolved solids and temperature of the evacuated groundwater were measured, and <br /> ' the groundwater was visually observed for color, turbidity, and the presence of floating chemical <br /> product. Physical parameters were recorded on water sample field data sheets included in <br /> Appendix A. <br /> ' Upon removal of the appropriate purge volume, stabilization of the measured parameters, and <br /> allowing water level recovery to 80 percent of the static level; samples were collected from each well <br /> using a dedicated disposable PVC bailer. Groundwater samples were decanted into prelabeled <br /> ' laboratory-supplied glassware, placed in an ice-filled cooler, and transported under chain-of-custody <br /> documentation to STL San Francisco of Pleasanton, California, a state-certified analytical laboratory. <br /> Fourth Quarter 2002 groundwater samples were analyzed for TPHg and TPHd by modified EPA <br /> ' Method 8015M. Laboratory analytical reports and chain-of-custody records are included in <br /> Appendix B. <br /> • Results of quarterly groundwater monitoring activities for the Fourth Quarter 2002 are summarized <br /> ' with historical results in Table 1. <br /> I:\Tower Park\QMR\2002 QMR\04 20024th QTR 2002.doc SECOR International Incorporated <br /> ' SECOR Project No.050T.02926.00.0004 1/22/2003 4:30 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.