Laserfiche WebLink
L � � <br /> Union Sae Deposit Work <br /> ni f it tan <br /> p <br /> 6.0 PROJECT SCHEDULE <br /> Augeas Corporation is prepared to begin this study upon receipt of approval of <br /> the proposed workplan from the San Joaquin County Environmental Health <br /> Division. It is estimated that the proposed scope of services will require <br /> approximately two weeks to complete.This schedule is partially dependent on <br /> time required for permit review, the scheduling of drilling equipment, local <br /> f weather restrictions,access to the site and time required for specific chemical <br /> L analysis. <br /> t i <br /> L� <br /> Project Number: UN5622 Page 8 of 8 <br />