My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
2353
>
2900 - Site Mitigation Program
>
PR0231735
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 4:24:05 PM
Creation date
5/7/2020 4:07:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0231735
PE
2381
FACILITY_ID
FA0003778
FACILITY_NAME
TRACY MARINE SALES
STREET_NUMBER
2353
STREET_NAME
TOSTE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
2353 TOSTE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICES <br /> SAN JOAQUIN COUNTY r' <br /> ENVIRONMENTAL HEALTH DIVISION �. <br /> Karen Furst, M.D., M.P.H., Health Officer.. ;P <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 2091468-3420 <br /> BOB MARTY ADVANCED GEOENVIRONMENTAL, INC. COILr <br /> 4005 NORTH WILSON WAY <br /> STOCKTON, CA 95205 DEC 0 6 1999 <br /> Re: TRACY MARINE SALES Site Code: 1735 <br /> 2353 TOSTE ROAD <br /> TRACY, CA 95376 <br /> This letter summarizes items discussed at the meeting on November 16, 1999 at the <br /> conference room of the Public Health Services building. Attending the meeting were <br /> staff members representing Advanced Ge oEnviron mental, Inc. (AGE) and staff <br /> members representing San Joaquin County Public Health Services, Environmental <br /> Health Division (PHS/EHD). <br /> In a telephone conversation on September 1, 1999 with AGE staff, the work proposed <br /> in Site Assessment Work Plan Addendum (the work plan) dated July 28, 1999 (received <br /> by this office on August 6, 1999) prepared by AGE was scheduled to commence on <br /> September 29, 1999. On September 28, 1999, AGE conveyed in a telephone <br /> conversation that the work could not begin on the following day because the <br /> responsible party had not obtained the pre-approval from the State Water Resources <br /> Control Board Tank Cleanup Fund (Fund) for the costs of the work. PHS/EHD <br /> agreed to extend the date to commence the proposed work to October 20, 1999. In a <br /> telephone conversation on October 18, 1999, AGE expressed that they could not begin <br /> work on the rescheduled date. Apparently the application for pre-approval of the costs <br /> of the work from the Fund was not mailed out until mid October. <br /> On November 8, 1999, PHS/EHD staff discovered Monitoring Well #5 (MW-5) was <br /> being installed at the above-referenced site. MW-5 was not a part of the work plan. <br /> PHS/EHD had no prior knowledge of or given approval of its installation. <br /> On November 10, 1999 in a telephone conversation with AGE, PHS/EHD discovered <br /> that an acetate sleeve was not utilized for the continuous core boring of MW-6. This <br /> was a condition provided when PHS/EHD approved the work plan. <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.