My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
2353
>
2900 - Site Mitigation Program
>
PR0231735
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 4:24:05 PM
Creation date
5/7/2020 4:07:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0231735
PE
2381
FACILITY_ID
FA0003778
FACILITY_NAME
TRACY MARINE SALES
STREET_NUMBER
2353
STREET_NAME
TOSTE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
2353 TOSTE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> r ' <br /> -Le Water Resources Control oard <br /> r Division of Clean.;Water,Pro ramsjt, <br /> 2014 T Street•Sacramento,California.95$'114 (99'6)2D 44I'l `, • •� <br /> Winston H. Hickox ra,) <br /> Mailing Address: P.Q.Box 94421,2•Sacramento,Calikirma•94244-ZI20 Gray Davis <br /> Secretaryfor rc nen <br /> FAX(916)227-4530•Interna Address:`hFP?//w.ww.swrcb. .gov/--cwphame/ustef Governor <br /> Environmental D <br /> Protection <br /> September 8, 1999 ' <br /> Toste Farms Inc. <br /> Attn: Joe Toste Jr. <br /> 2480 Toste Rd <br /> Tracy, CA 95376 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND PROGRAM,NOTICE OF ELIGIBILITY <br /> " _ y DETERMINATION: CLAIM NUMBER 014558; FOR SITE ADDRESS: 2353 TOSTE RD, TRACY <br /> Your claim has been accepted for placement on the Priority List in Priority Class "C"with a deductible <br /> of$5,000. <br /> We have completed our initial review. The next step in the claim review process is to conduct a <br /> compliance review. <br /> Compliance Review: Staff reviews; verifies, and processes claims based on the priority and rank within <br /> -a priority class. After the Board adopts the Priority List,your claim will remain on the Priority List until <br /> your Priority Class and rank are reached. At that time, staff will conduct an extensive Compliance <br /> Review at the local regulatory agency or Regional Water Quality Control Board. During this Compliance <br /> Review, staff may request additional information needed to verify eligibility. Once the Compliance x <br /> Review is completed, staff will determine if the claim is valid or must be rejected. If the claim is valid, a <br /> Letter of Commitment will be issued obligating funds toward the cleanup. If staff determine that you <br /> have not complied with regulations governing site cleanup,you have not supplied necessary information <br /> or documentation, or your claim application contains a material error, the claim will be.rejected. In such <br /> event, you will be issued a Notice of Intended Removal from the Priority List, informed of the basis for <br /> the proposed removal of your claim, and provided an opportunity to correct the condition that is the basis <br /> for the proposed removal. Your claim will be barred from further participation in the Fund, if the claim <br /> application contains a material error resulting from fraud or intentional or negligent misrepresentation. <br /> —Record keeoine: During your-cleanup project you should keep complete and well organized records of all <br /> corrective action activity and payment transactions..If you are eventually issued a Letter of Commitment, <br /> you will be required to submit: (1) copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices), (2) copies of canceled checks used to pay for work shown on the <br /> invoices, (3) copies of technical documents (bids,narrative work description, reports), and(4) evidence <br /> that the claimant paid for the work performed (not paid by another party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of reimbursement made'by the <br /> Fund. It is not necessary to submit these documents at this time; however, they will definitely be <br /> required prior to reimbursement. <br /> Compliance with Corrective Action Requirements: In order to be reimbursed for your eligible costs of <br /> cleanup incurred after December 2, 1991,you must have complied with corrective action requirements of <br /> Article 11, Chapter 16, Division 3,Title 23, California Code of Regulations. Article 11 categorized the <br /> corrective action process into phases. In addition, Article 11 requires the responsible party to submit an <br /> !' California En virenmenta/Protection Agency <br /> eG} Recr cled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.