Laserfiche WebLink
20 November 2003 <br /> AGE-NC Project No. 96-0263 <br /> Page 7 of 11 <br /> be based on the manufacturer's recommendations. Injection rates, frequency and duration may be <br /> v <br /> adjusted to compensate for site conditions during the initial operating period, based on dissolved <br /> concentration reaction to the sparging,ground water flow direction changes and to reduce mounding <br /> of the ground water were necessary. Procedures for installation and operation of the ozone sparging <br /> Ili system are described below. <br /> 7.2. IOS DURATION <br /> Sufficient data is not available to accurately predict the duration necessary to mitigate a site using <br /> ozone sparging as the remedial alternative.Mitigation duration is site specific.However,a reduction <br /> efficiency model will be developed during the first six-months of operation based on in-situ <br /> dissolved oxygen measurement,ground water sampling and MTBE-concentration trend analysis over <br /> the entire sparging time frame. <br /> �- 8.0. SCOPE OF WORK <br /> The scope of work will consist of the following tasks: <br /> • Permitting, planning and pre-field work activities; <br /> �. • Drilling and installation of sixteen shallow and two deep ozone sparge wells; <br /> • Installation of an ozone sparge system; and <br /> �• • Preparation of a report of findings. <br /> Each of these tasks are discussed below in detail. <br /> 8.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> Site boring permit applications will be submitted to the EHD. As required by EHD permitting, an <br /> L. updated health and safety plan will be prepared in accordance with Occupational Safety and Health <br /> Guidance Manual for Hazardous Waste Site Activities (National Institute for Occupational Safety <br /> and Health Administration, U.S. Coast Guard and U.S. Environmental Protection Agency, 1985). <br /> i- Prior to initiation of drilling, each proposed drilling location will be clearly marked and utility <br /> clearance obtained through Underground Service Alert.The EHD will be notified a minimum of 48 <br /> hours prior to commencement of any work. <br /> Advanced GcoEnvlronmental,Inc. <br />