My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
2353
>
2900 - Site Mitigation Program
>
PR0231735
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 4:14:51 PM
Creation date
5/7/2020 4:09:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0231735
PE
2381
FACILITY_ID
FA0003778
FACILITY_NAME
TRACY MARINE SALES
STREET_NUMBER
2353
STREET_NAME
TOSTE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
2353 TOSTE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 November 2003 <br /> AGE-NC Project No. 96-0263 <br /> Page 7 of 11 <br /> be based on the manufacturer's recommendations. Injection rates, frequency and duration may be <br /> v <br /> adjusted to compensate for site conditions during the initial operating period, based on dissolved <br /> concentration reaction to the sparging,ground water flow direction changes and to reduce mounding <br /> of the ground water were necessary. Procedures for installation and operation of the ozone sparging <br /> Ili system are described below. <br /> 7.2. IOS DURATION <br /> Sufficient data is not available to accurately predict the duration necessary to mitigate a site using <br /> ozone sparging as the remedial alternative.Mitigation duration is site specific.However,a reduction <br /> efficiency model will be developed during the first six-months of operation based on in-situ <br /> dissolved oxygen measurement,ground water sampling and MTBE-concentration trend analysis over <br /> the entire sparging time frame. <br /> �- 8.0. SCOPE OF WORK <br /> The scope of work will consist of the following tasks: <br /> • Permitting, planning and pre-field work activities; <br /> �. • Drilling and installation of sixteen shallow and two deep ozone sparge wells; <br /> • Installation of an ozone sparge system; and <br /> �• • Preparation of a report of findings. <br /> Each of these tasks are discussed below in detail. <br /> 8.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> Site boring permit applications will be submitted to the EHD. As required by EHD permitting, an <br /> L. updated health and safety plan will be prepared in accordance with Occupational Safety and Health <br /> Guidance Manual for Hazardous Waste Site Activities (National Institute for Occupational Safety <br /> and Health Administration, U.S. Coast Guard and U.S. Environmental Protection Agency, 1985). <br /> i- Prior to initiation of drilling, each proposed drilling location will be clearly marked and utility <br /> clearance obtained through Underground Service Alert.The EHD will be notified a minimum of 48 <br /> hours prior to commencement of any work. <br /> Advanced GcoEnvlronmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.