Laserfiche WebLink
21 February 2003 <br /> I AGE-NC Project No )6-0263 <br /> Page 4 of 4 <br /> I5.0. RECOMMENDATIONS <br /> Based on the findings of this investigation,AGE recommends continued quarterly monitoring of the <br /> ground water monitoring wells The next monitoring event should be performed in Marcn 2003 <br /> I AGE prepared Ground Water Extraction Feasibility Work Plan, dated 07 January 2002, for <br /> performance of a ground water extraction aquifer pumping test to assess the feasibility of ground <br /> water extraction as a remedial alternative at the site, the work plan was approved by the EHD by <br />' letter dated 14 January 2002 AGE anticipates that the pumping test will be performed during the <br /> first quarter 2003 <br /> 6.0. LIMITATIONS <br /> IOur professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided byan independent laboratory Evaluation ofthe hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br /> points(ground water samples)and subsurface conditions may vary away from these data points No <br /> I• other warranty, expressed or implied, is made as to the professional interpretations, opinions and <br /> recommendations contained in this report <br /> I <br /> I <br /> I <br /> • <br /> I <br /> Advanced GeoEnvironmental,Inc <br /> I <br />