Laserfiche WebLink
I <br /> 11 October 2002 <br /> AGE-NC Project No 96-0263 <br /> Page 4 of 4 <br /> 5 0 RECOMMENDATIONS <br /> Based on the findings of this Investigation,AGE recommends continued quarterly monitoring of the <br /> ground water monitoring wells The next monitoring event should be performed in December 2002 <br /> AGE prepared Ground Water Extraction Feasibility Work Plan, dated 07 January 2002, for <br /> performance of a ground water extraction aquifer pumping test to test the feasibility of ground water <br /> extraction as a remedial alternative at the site, the work plan was approved by the EHD by letter <br /> dated 14 January 2002 AGE anticipates that the pumping test will be performed during the fourth <br /> quarter 2002 <br /> 6.0 LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing In this or similar localities The findings were based upon <br /> analytical results provided by an Independent laboratory Evaluation ofthe hydrogeologlc conditions <br />' at the site for the purpose of this investigation was made from a limited number of available data <br /> points(ground water samples) and subsurface conditions may vary away from these data points No <br /> other warranty, expressed or Implied, Is made as to the professional Interpretations, opinions and <br /> recommendations contained In this report <br /> I <br /> I <br /> I <br /> I <br /> Advanced GeoEnvi ron mental,Inc <br />