Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> 10 INTRODUCTION 1 <br /> I20 BACKGROUND 1 <br /> 30 SCOPE OF WORK 2 <br />' 31 PERMITTING AND FIELD WORK PREPARATIONS 2 <br /> 32 WELL DRILLING AND SOIL SAMPLE COLLECTION 3 <br /> I <br /> 33 WELL COMPLETION AND DEVELOPMENT 3 <br /> 34 GROUND WATER EXTRACTION(PUMP) TEST 4 <br /> 35 REPORT PREPARATION 4 <br /> 40 FIELD PROCEDURES 5 <br /> 41 WELL INSTALLATION 5 <br /> 42 WELL COMPLETION 5 <br /> 43 WELL DEVELOPMENT AND SURVEY 6 <br /> 44 GROUND WATER EXTRACTION(PUMP) TEST 6 <br /> 45 SAMPLE SHIPMENT 7 <br /> 46 EQUIPMENT DECONTAMINATION 7 <br /> • FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Geologic Cross Section A-A' <br /> Figure 4 - Geologic Cross Section B-B' <br /> Figure 5 -Approximate Distribution of Dissolved TPH-g <br /> Figure 6 -Approximate Distribution of Dissolved Benzene <br /> Figure 7 -Approximate Distribution of Dissolved MTBE <br /> Figure 8 -Extraction Well Design <br /> Figure 9 - Observation Well Design <br /> TABLES <br /> Table 1 - Ground Water Elevations <br /> Table 2 -Analytical Results of Ground Water Samples <br /> Table 3 -Analytical Results of Soil Samples <br /> Table 4 -Analytical Results of Soil Samples <br /> Table 5 -Analytical Results of Grab Water Samples <br /> I Table 6 -Analytical Results of Grab Water Samples <br /> Table 7 -Analytical Results of Grab Water Samples <br /> . Table 8 -Proposed Ground Water Extraction Pilot Test Elements <br /> Advanced Geo Environmental,Inc <br /> I <br />