My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010597
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2900 - Site Mitigation Program
>
PR0507155
>
ARCHIVED REPORTS_XR0010597
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 11:09:54 AM
Creation date
5/8/2020 9:55:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010597
RECORD_ID
PR0507155
PE
2950
FACILITY_ID
FA0007718
FACILITY_NAME
3 B'S TRUCK PLAZA
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05515026
CURRENT_STATUS
02
SITE_LOCATION
14749 N THORNTON RD
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' 23 March 2001 <br /> • AGE-NC Project No 95-0130 <br />' Page 6 of 6 <br />' 4.0. RECOMMENDATIONS <br /> Based upon the CPT investigation results during the first quarter 2001, AGE recommends <br />' 1 Continued quarterly ground water monitoring, the next quarterly ground water monitoring <br /> event is tentatively scheduled for June 2001 <br />' 2 Additional vertical ground water investigation is warranted to assess the vertical and <br /> horizontal extent of petroleum hydrocarbon-impacted ground water at the site AGE <br />' recommends at least five additional CPT soil borings to assess the vertical and horizontal <br /> extent of hydrocarbon-impacted ground water at the site <br /> 3 Installation of additional shallow and deep-screened ground water monitoring wells based <br /> Ion the findings of the existing shallow ground water monitoring wells and CPT soil bonngs, <br /> the screen intervals for the deep-screened monitonng wells will be placed to define and <br /> monitor the vertical extent of the ground water plume in each informal hydrologic unit <br /> 4 Conduct a ground water pump testing to obtain general aquifer characteristics such as <br /> hydraulic conductivity, transmissivity, storativity and drawdown at various pumping rates <br /> Results of the pump test would be utilized to estimate a radius of influence for the zone of <br /> capture of dissolved petroleum hydrocarbons <br /> I 5 Install and continuously operate a ground water extraction system (interim remediation) in <br /> the area between MW-3 and P-12 (along geologic cross section D-D' to inhibit further <br /> vertical and off-site migration of the fuel-impacted ground water plume <br /> 5 0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this investigation are made from a limited number <br /> of available data points (CPT data and ground water samples), and subsurface conditions may vary <br /> away from these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> f <br /> • <br /> Advanced GeoEnvirun mental,Inc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.