My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010603
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2900 - Site Mitigation Program
>
PR0507155
>
ARCHIVED REPORTS_XR0010603
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 11:39:07 AM
Creation date
5/8/2020 9:57:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010603
RECORD_ID
PR0507155
PE
2950
FACILITY_ID
FA0007718
FACILITY_NAME
3 B'S TRUCK PLAZA
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05515026
CURRENT_STATUS
02
SITE_LOCATION
14749 N THORNTON RD
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 October 2000 <br /> AGE-NC Project No 97-0249 <br />' Page 5 of 5 <br /> I Additional vertical soil and ground water assessment is warranted at the site AGE proposes <br /> to drill three cone penetrometer testing(CPT) soil borings to characterize the vertical extent <br /> of hydrocarbon-impacted ground water at the site One CPT soil boring should be located <br /> between the former UST pit and the northwesterly fuel dispenser island area, a second CPT <br /> soil boring should be located near the easterly fuel dispenser island area, the third CPT soil <br /> boring should be located near the domestic water well DW-1 Proposed CPT soil boring <br /> Ilocations are depicted in Figure 2 <br /> • Installation of deep-screened ground water monitoring wells based on the findings of the <br /> proposed CPT soil borings, the screen Intervals for the deep-screened monitoring wells will <br /> be placed to define and monitor the vertical extent of the ground water plume <br /> • Installation of additional shallow-screened ground water monitoring wells south, southwest, <br /> west,northwest,north and northeast of the current area bound by wells MW-1 through MW- <br /> 6 to assess the lateral extent of the dissolved petroleum hydrocarbon plume (See Figure 2) <br /> • Continued quarterly ground water monitoring, the next quarterly ground water monitoring <br /> event is tentatively scheduled for November 2000 <br /> • Continued utilization of wells MW-1 through MW-6 for characterization of ground water <br /> conditions at the site <br /> • Continued coordinated quarterly ground water sampling events with Flag City Chevron <br /> I6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an Independent laboratory Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this investigation are made from a limited number <br /> of available data points (e g ground water samples), and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> I <br /> I <br /> I <br /> Advanced GeoEnvironmental,Inc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.