Laserfiche WebLink
I <br />' 13 June 2003 <br /> • AGE-NC Project No 97-0249 <br />' Page 8 of 8 <br />' ground water remediation system (I a interim ground pump-and-treat) be implemented at the site <br /> as soon as possible to establish hydraulic control and inhibit further off-site migration of the <br /> contaminated ground water plume until a full scale remediation system can be installed <br /> I <br /> 6.0. LIMITATIONS <br /> IOur professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br />' upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> available data points (ground water samples), and subsurface conditions may vary away from these <br /> data points No other warranty, expressed or implied, is made as to the professional interpretations, <br /> opinions and recommendations contained in this report <br /> r <br /> r � <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> Advanced GeoEnvironmental,Inc <br /> l <br />