Laserfiche WebLink
I <br /> I07 September 2005 <br /> AGE-NC Project No 97-0249 <br />' Page 8 of 8 <br /> I AGE recommends that a ground water pump-and-treat, interim remediation technology be <br /> Implemented at the site based on the following assumptions <br /> I • permeable to semi-permeable lithology between 15 and 50 feet bsg <br /> • pump-and-treat would Implement Immediate hydraulic control <br />' • successful pump-and-treat remediation results achieved from the adjacent Flag City Chevron <br /> between November 2000 and August 2004 <br /> 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> available data points (ground water samples), and subsurface conditions may vary away from these <br /> data points No other warranty, expressed or implied, is made as to the professional interpretations, <br /> opinions and recommendations contained in this report <br /> I <br /> I <br /> I <br /> IAdvanced GeoEnvironmental,Inc <br />