Laserfiche WebLink
07 September 2005 <br /> AGE-NC Project No 97-0249 <br /> Page 2 of 8 <br /> At the request of the CRWQCB,ground water monitoring events performed at the Three B's Truck <br /> Plaza site and the Flag City Chevron site (6421 Capitol Avenue) have been coordinated to occur <br /> concurrently,the Flag City Chevron ground water monitoring and analytical results are included in <br /> Appendix A <br /> 2 1 WELL MONITORING AND EVACUATION <br /> On 28 March 2005,depth to ground water was measured in each well from the top of the well casing <br /> to the nearest 0 01-foot utilizing a Solinst water level meter <br /> On 29-30 March 2005,approximately 7'/2 to 9 gallons of ground water(a minimum of three casing- <br /> water volumes per well)were evacuated(purged)from single-level monitoring wells MW-1 through <br /> MW-6 utilizing dedicated,disposable polyethylene bailers Temperature,pH and conductivity were <br /> measured for stabilization at regular purge-volume intervals from each well using an Oakton water <br /> analyzer Field data logs are provided in Appendix B Purged ground water was containerized in 55- <br /> gallon drums and stored on-site in an area lacking general public access <br /> . On 29-30 March 2005, multi-level monitoring wells MW-7 through MW-12 were purged by <br /> lowering and raising a 3/8-inch outer diameter, length-discrete polyethylene hose equipped with a <br /> ball-valve water tip through the top chambers into the specific water-charged screened section A <br /> Watera-Hydra-Lift II pump equipped with a mechanical arm was utilized to surge each well with a <br /> polyethylene hose Approximately '/a to 43/4 gallons of ground water (a minimum of three casing- <br /> water volumes per well) were purged from each well Temperature, pH and conductivity were <br /> measured for stabilization at regular purge-volume intervals from each well using the Oakton water <br /> analyzer Field data logs are included in Appendix B Multi-level well purged ground water was <br /> transferred to 55-gallon drums and stored on-site in an area lacking general public access <br /> 2 2 GROUND WATER SAMPLING <br /> After each well was purged,ground water levels were measured to verify the amount of ground water <br /> recharge Upon achieving at least 80% ground water recharge, samples were collected from wells <br /> MW-1 through MW-12 utilizing the dedicated, disposable bailers or the above referenced Watera <br /> Hydro-Lift II pump system Ground water samples were transferred into 40-m1 EPA-approved <br /> volatile organic analysis (VOA) vials containing 0 5 ml 18% hydrochloric acid as a sample <br /> preservative and 1-liter amber bottles without sample preservative Care was taken to ensure that <br /> visible air bubbles were not present in the vials after filling and capping Ground water sample <br /> containers were labeled with the well designation, date, time, and sampler's initials <br /> Advanced GeoEnvironmental,Inc <br />