Laserfiche WebLink
Advanced <br /> GeoEnvironmental, Inc. <br /> 837 Shaw Road Slockton CA 95205 •(209)467-1006 •Fax(209)467-1118 <br /> 1 <br /> Monitoring Well Field Log <br />' Well Data <br /> Project Name Project No Date <br />' THREE B'S 4GE-NG96-0249 12/24J /04 <br /> Pre-Purge DTW 10(,1 Y Time 1,0 f,6 Well I D <br /> Post-Purge DTW f e> Tune 0-elf <br /> )p MW <br />' Total Depth of Well Wel ume Casing Diameter 0 2" 4" 6" <br /> p 5 <br /> Gal/Ft 0 0107,41 0 16 065 147 <br />' Sampler(s) Sample Contamers <br /> aT/RM 1 LITER/3 VOAS <br /> Sample I D Analysis TPH-g&TPH-d,BTEX W/MTBE <br /> MW-C( 112-7—, -04 5 FUEL OXYS, 1,2 DCA&EDB <br />' Stabilization Data <br /> Time Volume pH Temp Cond Color/ Nates <br /> (gallons) S/cm Turbidity <br /> 7 -Z ��� � -< <br /> a�75 <br /> gr_7� --?--z tc' 2c® r r r c <br /> f�Sa c ,77,C) -36D { c t <br /> 1 <br /> Purge Method ATERRA INERTIA PUMP -OR-DISPOSABLE BAILER <br /> Sample Method SAME Well Integrity <br /> Sample Time 002— Dissolved 02 C <br /> Oakton % mg/L <br /> Vmm 3 CV0898aMM <br />