Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> SA-92-75 <br /> 3 . The frontage improvement for Forest Lake Road shall be <br /> constructed in conformance with the standards for one-half of <br /> a 50-foot right-of-way rural road. The construction of the <br /> frontage improvements will be deferred upon execution by the <br /> owner of a Deferred Frontage and Roadway Improvement Agreement <br /> or a Secured Deferred Frontage and Roadway Improvement <br /> Agreement with a deposit equivalent to their estimated <br /> construction costs prior to approval of the Improvement Plan. <br /> (A $260. 00 fee currently is required for processing per <br /> Development Title Table 9-240.2 in addition to a copy of the <br /> Grant Deed and an estimate for the required frontage <br /> improvements. The estimate shall be prepared by a Registered <br /> Civil Engineer with a typical section drawing on a form to be <br /> supplied by the Public Works Department and submitted to the <br /> Public Works Department for approval. As an option the <br /> Department of Public Works will prepare the drawing and <br /> estimate for an additional fee of $115. 00. ) <br /> (Development Title Section 9-1150.2) <br /> 4 . The driveway approach shall be improved in accordance with <br /> the requirements of the San Joaquin County Standards R-13 & <br /> R-17 prior to issuance of the building permit. <br /> (Development Title Section 9-1145.5) <br /> 5. Encroachment permit shall be required for work within road <br /> right-of-way. <br /> (Development Title Section 9-1145. 2) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> FEB 3 199 , <br /> COMMUNII-Y Ute <br /> PLANNING DI�ISp4 <br /> 2 <br />