My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010758
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2900 - Site Mitigation Program
>
PR0507155
>
ARCHIVED REPORTS_XR0010758
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 11:03:52 AM
Creation date
5/8/2020 10:53:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010758
RECORD_ID
PR0507155
PE
2950
FACILITY_ID
FA0007718
FACILITY_NAME
3 B'S TRUCK PLAZA
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05515026
CURRENT_STATUS
02
SITE_LOCATION
14749 N THORNTON RD
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quarterly Report - Fourth Quarter 2003 <br /> THREE B'S TRUCK PLAZA <br /> 14749 Thornton Road, Lodi, California <br /> 1.0. INTRODUCTION AND SCOPE OF WORK <br /> Advanced GeoEnvironmental, Inc (AGE) has prepared this quarterly report for 14749 Thornton <br /> Road (the site), Lodi, California The site setting is illustrated on Figure 1 Site structures and <br /> monitoring well locations are depicted on Figure 2 <br /> The objective of the work was to monitor dissolved petroleum hydrocarbon concentrations in ground <br /> water and to characterize ground water flow direction and gradient on the site This report has been <br /> prepared in accordance with guidelines issued by the California Regional Water Quality Control <br /> Board - Central Valley Region (CRWQCB-CVR) for investigation of underground storage tank <br /> (UST)sites A summary of previous investigations at the site was included in Work Plan Addendum <br /> -July 2002, dated 23 July 2002,prepared by AGE, ground water monitoring data acquired to date <br /> is included in the tables of this report <br /> Previous soil characteristics data obtained by a CPT investigation enabled AGE to define six <br /> informal hydrologic units (CPT Site Investigation -Fourth Quarter 2001, dated 15 March 2002) <br /> The informal hydrogeologic units were defined as Hydrologic Unit 1 (10-35 feet bsg), Hydrologic <br /> Unit 2 (35-60 feet bsg), Hydrologic Unit 3 (60-90 feet bsg), Hydrologic Unit 4 (90-110 feet bsg), <br /> • Hydrologic Unit 5 (110 to 130 feet) and Hydrologic Unit 6 (130 to at least 150 feet bsg) <br /> The following is a brief summary of fourth quarter site assessment activities performed at the site <br /> c 08 December 2003 - Depth to water measurements collected at wells MW-1 through <br /> MW-12,ground water monitoring performed at wells MW-9(A-C),MW-10(A-F)and MW- <br /> 8 (A-F), <br /> • 09 December 2003 - Ground water monitoring performed at wells MW-7 (A-E), MW-8 <br /> (A-F) and MW-9 (D-E), <br /> • 11 December 2003 - Ground water monitoring performed at wells MW-1 through MW-6, <br /> MW-11 (A-F) and MW-12 (A-F) <br /> I2.0. MONITORING AND SAMPLING PROCEDURES <br /> On 08, 09 and 10 December 2003, ground water monitoring was performed at the site on ground <br /> I water monitoring wells MW-1 through MW-12, monitoring well construction details are <br /> summarized in Table 1 Groundwater monitoring procedures were outlined in Work Plan Addendum <br /> - October 1998, dated 14 October 1998,prepared by AGE and approved by the San Joaquin County <br /> Environmental Health Department (SJCEHD) by letter dated 21 December 1998 <br /> Advanced GeoEnvironmental,Inc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.