Laserfiche WebLink
RESPONSE TO COMMENTS FROM: U.S. Soil Conservation Service <br /> 1. Mitigation 1, Section 3.1.3 of the EIR has been changed to require that a plan <br /> for temporary revegetation be submitted to and approved by the County and the <br /> Soil Conservation Service prior to project development. <br /> 2. The applicant has proposed that cut slopes be constructed at 1.5:1 (horizontal to <br /> vertical). Mitigation 2, Section 3.1.3 of the EIR requires that cut slopes for <br /> excavation and reclamation be established by a soils engineer or certified <br /> engineering geologist. This mitigation has been revised to include temporary <br /> stockpiles. <br />