Laserfiche WebLink
e <br /> (d) The board may decline to hear an appeal if it determines (e) The size and legal description of the lands that will be <br /> that the appeal raises no substantial issues related to the lead agen- affected by such operation. a map that includes the boundaries <br /> cy's review pursuant to this section. and topographic details of such lands,a description of the general <br /> (e) Appeals that the board does not decline to hear shall be geology of the area, a detailed description of the geology of the <br /> scheduled and heard at a public hearing within 45 days of the area in which surface mining is to be conducted. the location of <br /> filing of the appeal, or any longer period as may be mutually all streams, roads, railroads, and utility facilities within, or ad- <br /> agreed upon by the board and the person filing the appeal. In jacent to, such lands, the location of all proposed access roads to <br /> hearing an appeal, the board shall only determine whether the be constructed in conducting such operation, and the names and <br /> plan substantially meets the requirements of Sections 2772 and addresses of the owners of all surface and mineral interests of such <br /> 2773 and the lead agency surface mining ordinance adopted pur- lands. <br /> suant to subdivision (a) of Section 2774. A plan judged to meet (f) A description of and plan for the type of surface mining to <br /> these requirements shall be approved. A plan judged not to meet be employed and a time schedule that will provide for the com- <br /> these requirements shall be returned to the person filing the appeal pletion of surface mining on each segment of the mined lands so <br /> with a notice of deficiencies, who shall be granted, once only, a that reclamation can be initiated at the earliest possible time on <br /> period of 30 days to correct the noted deficiencies and submit the those portions of the mined lands that will not be subject to further <br /> revised plan to the lead agency for review and approval. disturbance by the surface mining operation. <br /> (f) Any enforcement action which may be brought against an (g) A description of the proposed use or potential uses of the <br /> operator with vested rights pursuant to Section 2776 shall be held land after reclamation and evidence that all owners of a possessory <br /> in abeyance pending action on an application pursuant to subdi- interest in the land have been notified of the proposed use or <br /> vision(b)or the resolution of an appeal filed with the board pur- potential uses. <br /> suant to subdivision(c). (h) A description of the manner in which reclamation,adequate <br /> §2770.5. Whenever surface mining operations are proposed in for the proposed use or potential uses will be accomplished. <br /> the 100-year flood plain for any stream, as shown in Zone A of including: <br /> Flood Insurance Rate Maps issued by the Federal Emergency Man- (1) a description of the manner in which contaminants will <br /> agement Agency, and within one mile, upstream or downstream, be controlled, and mining waste will be disposed;and <br /> of any state highway bridge, the lead agency receiving the appli- (2) a description of the manner in which rehabilitation of <br /> cation for the issuance or renewal of a permit to conduct the surface affected streambed channels and streambanks to a condition <br /> mining operations shall notify the Department of Transportation minimizing erosion and sedimentation will occur. <br /> that the application has been received.The Department of Trans- <br /> portation shall have a period of not more than 45 days to review (i) An assessment of the effect of implementation of the recla- <br /> and comment on the proposed surface mining opera.:ons with mation plan on future mining in the area. <br /> respect to any potential damage to the state highway bridge from 0) A statement that the person submitting the pla. ac.%,pts re- <br /> the proposed surface mining operations.The lead agency shall not sponsibility for reclaiming the mined lands in accordance v.ith the <br /> issue or renew the permit until the Department of Transportation reclamation plan. <br /> has submitted its comments or until 45 days from the date the (k) Any other information which the lead agency may require <br /> application for the permit was submitted,which ever occurs first. by ordinance. <br /> §2771. Whenever a proposed surface mining operation is §2773. The reclamation plan shall be applicable to a specific <br /> within the jurisdiction of two or more public agencies, is a per- piece of property or properties,and shall be based upon the char- <br /> mitted use within the agencies, and is not separated by a natural acter of the surrounding area and such characteristics of the prop- <br /> or manmade barrier coinciding with the boundary of the agencies, erty as type of overburden, soil stability, topography, geology, <br /> the evaluation of the proposed operation shall be made by the lead climate,stream characteristics,and principal mineral commodities. <br /> agency in accordance with the procedures adopted by the lead §2774. (a) Every lead agency shall adopt ordinances in accor- <br /> agency pursuant to Section 2774. In the event that a dispute arises dance with state policy which establish procedures for the review <br /> as to which public agency is the lead agency, any public agency and approval of reclamation plans and the issuance of a permit to <br /> which is a party to the dispute may submit the matter to the board; conduct surface mining operations, except that any lead agency <br /> and the board shall designate the public agency which shall serve without an active surface mining operation in its jurisdiction may <br /> as the.lead agency, giving due consideration to the capability of defer adopting an implementing ordinance until the filing of a <br /> such agency to fulfill adequately the requirements of this chapter permit application.Such reclamation and permit ordinances shall <br /> and to an examination of which of the public agencies has principal establish procedures requiring at least one public hearing and <br /> permit responsibility. periodic inspections of surface mining operations, and may in- <br /> §2772. The reclamation plan shall be filed with the lead agency elude provisions for liens,surety bonds,or other security to guar- <br /> on a form provided by the lead agency, by any person who owns, antee reclamation in accordance with the reclamation plan. Such <br /> leases,or otherwise controls or operates on all,or any portion of ordinances shall be periodically reviewed by the lead agency and <br /> any, mined lands. and who plans to conduct surface mining op- revised, as necessary, in order to ensure that the ordinances con- <br /> erations thereon. tinue to be in accordance with state policy. <br /> The reclamation plan shall include the following information (b) Lead agencies shall notify the State Geologist of the filing <br /> and documents: of an application for a permit to conduct surface mining operations. <br /> (a) The name and address of the operator and the names and (c) On request of a lead agency,the State Geologist shall furnish <br /> addresses of any persons designated by him as his agents for the technical assistance to assist in the review of reclamation plans. <br /> service of process. §2774.3. The board shall review lead agency ordinances which <br /> (b) The anticipated quantity and type of minerals for which the establish permit and reclamation procedures to determine whether <br /> surface mining operation is to be conducted. each ordinance is in accordance with state policy,and shall certify <br /> (c) The proposed dates for the initiation and termination of such the ordinance as being in accordance with state policy if it ade- <br /> operation. quately meets, or imposes requirements more stringent than, the <br /> (d) The maximum anticipated depth of the surface mining California surface mining and reclamation policies and proce- <br /> operation. dures established by the board pursuant to this chapter. <br /> 4 <br />