Laserfiche WebLink
RESPONSE TO COMMENTS FROM: California Regional Water Quality Control <br /> Board, Central Valley Region <br /> 1. The proposed quarry operations would not generate tailings, nor would any <br /> tailings from previous mining activities be disturbed by project excavation <br /> activities. The only proposed pond associated with the quarry would be the <br /> storm water impoundment to be located in the southeastern portion of the project <br /> site. 'A discussion of this surface water impoundment is provided in Section 2.6 <br /> of the EIR. <br /> Mitigation 6 has been added to Section 3.2.3 to address potential permitting <br /> requirements through the California Regional Water Quality Control Board. <br />