Laserfiche WebLink
retention basin; however, they did state that they would like to be involved in <br /> the review of both the erosion control plan and the design of the retention basin. <br /> The mitigations in the EIR have been revised to include review by the RWQCB. <br /> Because the applicant has indicated that they would dewater the excavation pits <br /> +` if groundwater were encountered during excavation, Mitigation 7, Section 3.2.3 <br /> of the EIR has been changed to reflect the information discussed in response <br /> number 2, above. <br /> 7. Section 8.0 of the EIR, Mitigation Monitoring Program, has been changed to <br /> reflect financial responsibilities for mitigation implementation and monitoring. <br />