Laserfiche WebLink
• Page 1 of 6 <br /> SITE SAFETY AND OPERATIONS PLAN <br /> Site: San Joaquin County - DPW, Thornton Project No.: 20939-011.001 <br /> Location: Intersection of Thornton Road Date: April 8, 1998 <br /> and Walnut Grove Road Prepared by: H. Duke <br /> Thornton, California <br /> Client contact: Al Blevens (San Joaquin County - DPW) <br /> Project objectives: Advance five (5) geoprobe soil borings and collect soil and groundwater samples to evaluate <br /> soil and groundwater conditions at the site. <br /> Scheduled activities and time period: Drilling of five (5) geoprobe soil borings April 14, 1998. <br /> Background Review <br /> Preliminary Complete <br /> Access, overhead/underground utilities, etc.: O ❑ <br /> Waste characterization: ❑x ❑ <br /> Hazard/safety level determination Ox ❑ <br /> Comments: <br /> Waste Type(s)/Characteristics <br /> Liquid ❑x Solid ❑ Sludge ❑ Gas O <br /> Corrosive ❑ Ignitable ❑x Reactive ❑ Volatile x❑ <br /> Toxic ❑x Radioactive ❑ Unknown ❑ Other ❑ <br /> Special considerations and comments: Aromatic compounds may be present in site soil. Benzene is of primary <br /> toxicology significance. Benzene is a known carcinogen with a permissible exposure limit of 1 part per million in <br /> air. Personal protective equipment should be used (if determined by air monitoring) to prevent exposure. <br /> SAMN:\PM0939\09390110.1 BS-98\pzusmer:1 Rev.0,04/08/98 <br />