Laserfiche WebLink
I <br /> N S E C O R - <br /> i <br /> The location of Well DW-3 was verified in the field and surveyed , and is situated 260 feet south of <br /> the site, on the south bank of Mosher Slough, which borders the intersection of Thornton Road <br /> and Davis Road . Three additional water supply wells in the area were identified. One well was <br /> identified at Bear Creek Veterinarian Hospital (Well DW-2) , located at 8728 Thornton Road , Well <br /> DW-2 is located 444 feet north of the site. Another well is located at a residence (Well DW4) , <br /> located at 8732 Davis Road ( 180 feet north of the site). SECOR field staff located what appeared <br /> to be a domestic water supply well (Well DW- 1 ) on the property located at 8855 Thornton Road <br /> and is 281 feet northwest of the site. The resident was not available to confirm the existence of <br /> the well, and a well survey form was not completed by the property owner; however, the possible <br /> domestic well was housed in a similar enclosure as the previously identified wells in the field . <br /> MONITORING AND SAMPLING <br /> The site has been monitored and sampled since 1s' quarter, 1999. From 1999 to the present the <br /> Site has been monitored/sampled quarterly. Currently, 10 wells (MW-1 through MW-10) are <br /> monitored and sampled quarterly each year. Samples are analyzed for TPHg, BTEX, and fuel <br /> oxygenates. <br /> Based on TRC's Quarterly Monitoring Report dated October 7, 2004 maximum TPPH and MtBE <br /> concentrations were 5, 000 ppb (MW-4) and 8,400 (MW-4), respectively. Groundwater direct in <br /> both the shallow and deep zone was to the northeast. <br /> REMEDATION STATUS <br /> No active remediation . <br /> CHARACTERIZATION STATUS <br /> Contamination in soil and groundwater has been adequately delineated . <br /> RECENT SUBMITTALS/CORRESPONDENCE <br /> None <br /> THIS QUARTER ACTIVITIES (Third Quarter 2004) <br /> 1 . Prepared and submit a quarterly summary report. <br /> 2. Performed quarterly groundwater monitoring and sampling. <br /> NEXT QUARTER ACTIVITIES (Fourth Quarter 2004) <br /> 1 . Perform quarterly groundwater monitoring and sampling (TRC) . <br /> 2. Prepare and submit a quarterly summary report. <br /> 3. Prepare and submit a work plan for soil vapor extraction pilot testing . <br />