My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2900 - Site Mitigation Program
>
PR0507911
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 11:58:50 AM
Creation date
5/8/2020 11:28:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507911
PE
2950
FACILITY_ID
FA0007834
FACILITY_NAME
CIRCLE K #8671
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICES <br /> SAN JOAQUIN COUNTY ®� <br /> ENVIRONMENTAL HEALTH DIVISION mi <br /> Karen Furst, M.D., M.P.H. , Health Officer • �... <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> ��jtiRa�Y . <br /> 209/468-3420 <br /> ED RALSTON <br /> TOSCO MARKETING COMPANY <br /> 2000 CROW CANYON PLACE, SUITE 400 <br /> SAN RAMON CA 94583 <br /> WORK PLAN: Work Plan for Additional Site Assessment, Well Survey, and Site Conceptual Model <br /> DATED: May 23, 2001 <br /> PREPARED BY: Secor <br /> APPROVED: <br /> ISA "R VED: <br /> ADDENDUM NEEDED: submitbv: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [1-186 25299.37,subd(c) (3)1: <br /> 1. Tosco will install three additional monitoring wells and one continuous core to define the vertical and lateral <br /> extent of gasoline and MTBE contamination in soil and groundwater. <br /> 2. Tosco will conduct a well receptor survey with a 2000 foot radius. <br /> 3. Tosco will began to develop a Site Conceptual Model which will be used to investigate and assess the impacts <br /> of the release. <br /> 4. All samples must be analyzed for TPH g, BTEX and fuel oxygenates. <br /> COMMENTS AND CONDITIONS: <br /> The "Tri-Regional Board Staff Recommendations For Preliminary Evaluation and Investigation of Underground Tank <br /> Sites" along with its "Appendix t1 and "Appendix B" should be used as guidance documents. All work and report - <br /> which require geological or engineering evaluation must be performed under the direction of an appropriate California <br /> registered or certified professional. <br /> DATED r ��oi BY <br /> Harlin Knoll, Senior REHS 209) 468-3442 <br /> CC: RWQCB, Central Valley Region-Marty Hartzell <br /> Secor-Benkosky <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.