My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2900 - Site Mitigation Program
>
PR0507911
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 11:58:50 AM
Creation date
5/8/2020 11:28:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507911
PE
2950
FACILITY_ID
FA0007834
FACILITY_NAME
CIRCLE K #8671
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i . <br /> M Former Circle K Store No . 08671 Page 2 of 3 <br /> 8606 Thornton Road June 12 , 2015 <br /> Stockton , California 95209 <br /> California 95205-6232. Prior to distribution of the notification, please provide a copy of the draft <br /> letter to the EHD for review and comment along with the list of agencies and owners/occupants <br /> who will receive the public participation letter. An example letter is available from the EHD, if <br /> requested. The public will have sixty days to comment. <br /> During the sixty-day public participation period , it is necessary to plan and prepare to execute the <br /> destruction of all wells installed as part of your site investigation and remedial action so that once <br /> responses received during the sixty-day public participation period have been properly <br /> addressed, well destructions can commence. <br /> Please submit a scope of work proposal that details the conditions and construction of the wells <br /> and the methods and materials to be used to destroy them . To be issued a well destruction <br /> permit, the proposal must address the concerns of the EHD and the San Joaquin County Well <br /> Standards requirements, such as: <br /> • Wells that have laboratory data from the last sampling event that demonstrate the <br /> presence of any contaminants of concern remaining in groundwater are to be destroyed <br /> by removing all the contents of the well [well casing, screen , filter pack, grout sealant <br /> (except steel conductor casing) ; the cleared borehole is then to be sealed with neat <br /> cement from the bottom upward to the depth of three to five feet below grade. <br /> • All wells with unknown construction and/or located in an area of known or suspected <br /> contamination are to be destroyed by removing all the contents of the well [well casing , <br /> screen , filter pack, grout sealant (except steel conductor casing)]; the cleared borehole is <br /> then to be sealed with neat cement from the bottom upward to the depth of three to five <br /> feet below grade. <br /> • Wells that have laboratory data from the last groundwater sampling event that report non- <br /> detectable concentrations of contaminants of concern and with acceptable laboratory <br /> detection limits , and are not in an area of known or suspected soil contamination , may be <br /> destroyed by pressure grouting from the bottom upward , while leaving the well casing in <br /> place. The top two-and-a-half feet or more of the well shall be drilled out with an auger <br /> that is at least one foot larger in diameter than the auger originally utilized to install the <br /> well, and the soil around the cut-off casing removed to the depth of an additional six <br /> inches below the new `top' of the cut-off casing . The grout sealant shall spill out of the <br /> top of the well casing to form a mushroom cap seal with at least twelve inches of neat <br /> cement grout poured six inches above and six inches below the top of the cut-off casing . <br /> • All groundwater displaced to the surface during grout installation shall be pumped out of <br /> the excavation to allow for EHD inspection and verification that the well has been properly <br /> destroyed . Contaminated groundwater pumped out of the excavation shall be <br /> containerized for proper disposal . <br /> After the EHD has approved the well destruction scope of work proposal and the public <br /> participation comments have been properly addressed , you may submit an EHD Well and Boring <br /> Permit Application form for each parcel along with a Licensed Contractors' Declaration (LCD) , <br /> Encroachment Permit issued by the City of Stockton , Master File Record (MFR) form , and <br /> appropriate fees . The permit fee for the well destruction of seven onsite and three off-site <br /> monitoring wells , two soil vapor extraction wells, and eight oxygen injection wells is $ 1 , 040. 00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.