Laserfiche WebLink
W , <br /> M <br /> August 13 , 2009 <br /> I Page 2 <br /> APPLICABLE <br /> RATIONALE DESCRIPTION OF REASON/RATIONALE <br /> CHECK X <br /> Assessment Incomplete <br /> WDR Permit Requirement <br /> X Well Being Sampled During Remedial Action for Progress Assessment <br />! Well Being Sampled For Free Product Evaluation and Reduction Verification <br /> Well Being Sampled Within First Year of Being Installed <br /> i Well Being Sampled for Post- Remedial Action Verification Monitoring <br /> Well Has Not Shown Reliable Consistency Yet To Warrant Reduction in <br /> Sampling Frequency <br /> Well Is Last Point of Monitoring Prior to possible impact to Receptor <br /> Other <br /> Note: ' = Indicates applicable reason or rationale for at least one well at the site being monitored at a frequency other <br /> than semi-annual. <br /> For additional details on a per well basis , refer to the attached Groundwater Monitoring <br /> Schedule spreadsheet. <br /> Based on the proposed sampling frequency at the Site, the recommended Groundwater <br /> Monitoring Report submittal frequency is summarized as follows : <br /> SAMPLING REPORTING REPORT DUE DATE <br /> PERIOD FREQUENCY <br /> Quarterly* Quarterly 30th day after period . <br /> Note: * = may not apply to all wells; see attached spreadsheet. <br /> If you should have any questions , please contact me at 916-558-7604 or <br /> Eric.G .Hetrick@contractor.conocophi Ili ps . com . <br /> Sincerely, <br /> Eric Hetrick <br /> ConocoPhillips RM &R Site Manager <br /> Attachment: Groundwater Monitoring Schedule <br /> cc: TRC — Anju Farfan <br /> Stantec — Mark Bare <br />