My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2900 - Site Mitigation Program
>
PR0507911
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 11:58:50 AM
Creation date
5/8/2020 11:28:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507911
PE
2950
FACILITY_ID
FA0007834
FACILITY_NAME
CIRCLE K #8671
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� o . l , ro w000vds FIFTH FLOOR PAGE 02 <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Donna JC. Heron, ILE.H.S. UnieSupernisors <br /> d Director 304 East Weber Avenue? Third Floor Carl Boroman, R,E.H.S. <br /> At Olsen, R.C.H.S. Stockton, California 95202-2708 Miko Hu Shins, R.E.H.S. , R.D.I. <br /> d4 icoa�'' P • ie A, Cn Manager <br /> Telephone : (209) 468 3420 Douglas W. Wilson, R,E.H, S. <br /> Laurie A. Corolla, R.E.H.S, Margaret Lagorio, R.E.H. S. <br /> Program Manager Fax: (209) 464-0138 Robert McCtellon, R E.H. S. <br /> Mark Barcellos, R.E,H,S- <br /> BD RALSTON <br /> 2000 CROW CANYON pLAcs SUITE 400 <br /> SAN RAMON CA 94583 - - <br /> RE : 8606 THORNTON ROAD SITE CODE : 2261 <br /> STOCKTON CA 95209 <br /> WORK PLAN : ,Additional Site Assessment <br /> DATED : April 14 , 2003 <br /> PREPARED BY ; Secor <br /> APPROVED : [X ] <br /> ADE?'—JA—TE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25299 . 37 ( C ) ( 3 ) ] : <br /> 1 . To install 2 additional deep MWs . To Collect selected <br /> soil and <br /> ground water samples for analyses . <br /> 2 . To analyze soil samples for : TPH- gas , BTEX , and fuel oxygenates using <br /> 026Pb - <br /> 3 . To develop the Mws after inStallaion . <br /> 4 . To analyze ground water samples for : TVHgas , BTEX , 5 fuel <br /> oxygenates , ethanol , 1 , 2 - DCA , EDB , using 8260b . <br /> COMMENTS AND CONDITIONS : <br /> 14 An additional third deep well will be required east (downgradient ) of <br /> MW4 due to the increasing MTBE concentration in ground water . Soil <br /> and groundwater samples must be analyzed for the above gasoline <br /> constituents . <br /> 2 . All necessary access agreements and permits must be procured prior to <br /> being any work . <br /> 3 - A report of finding must be completed and submitted to EHD and <br /> CVRwgCB by September 1 , 2003 , <br /> DATED 01 BY IJ' LCI'. � <br /> Harlin Rnoll , Seri].or RENS (209 ) 468 - 3442 <br />
The URL can be used to link to this page
Your browser does not support the video tag.