My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010541
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2900 - Site Mitigation Program
>
PR0507911
>
ARCHIVED REPORTS_XR0010541
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:18:53 PM
Creation date
5/8/2020 11:31:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010541
RECORD_ID
PR0507911
PE
2950
FACILITY_ID
FA0007834
FACILITY_NAME
CIRCLE K #8671
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S EcC ® R <br /> i <br /> • CONCLUSION AND RECOMMENDATIONS <br /> Based on groundwater concentration vs time graphs prodded by TRC, MTBE in the <br /> shallow zone has started to decrease or stabilize in wells MW-1, MW-3, MW-4, MW-5, <br /> MW-6, MW-8, MW-9 and MW-10 There is still a slight increase in MtBE in wells MW-2 <br /> and MW-7 SECOR completed a soil vapor extraction (SVE) pilot test and will submit <br /> results during the 3`d Quarter 2005 SECOR also recommends continued monitoring to <br /> verify contaminant concentration trends at the site <br /> RECENT SUBMITTALSICORRESPONDENCE <br /> April 14, 2005—Well Application and Permit <br /> April 21, 2005 Notification of Scheduled Environmental Activities <br /> THIS QUARTER ACTIVITIES (Second Quarter 2005) <br /> 1 TRC performed quarterly groundwater monitoring and sampling <br /> 2 Submitted quarterly site status report <br /> 3 installed soil vapor extraction wells <br /> 4 Completed pilot test for SVE <br /> NEXT QUARTER ACTIVITIES (Third Quarter 2005) <br /> • 1 TRC to perform quarterly groundwater monitoring and sampling <br /> 2 Submit quarterly site status report <br /> 3 Submit SVE pilot test report <br /> CONSULTANT SECOR International, Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.