My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010547
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2900 - Site Mitigation Program
>
PR0507911
>
ARCHIVED REPORTS_XR0010547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:16:14 PM
Creation date
5/8/2020 11:33:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010547
RECORD_ID
PR0507911
PE
2950
FACILITY_ID
FA0007834
FACILITY_NAME
CIRCLE K #8671
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEC0 [R <br /> CONCLUSION AND RECOMMENDATIONS <br /> Based on groundwater concentration vs time graphs provided by TRC, MTBE in the <br /> shallow zone continues to increase SECOR has recommended the completion of a soil <br /> vapor extraction (SVE) pilot test and interim ozone spargmg at the site SVE pilot testing <br /> has been approved SECOR also recommends continued monitoring to verify <br /> contaminant concentration trends at the site <br /> RECENT SUBMITTALSICORRESPONDENCE <br /> March 24, 2005— San Joaquin County Letter approving proposed SVE pilot testing <br /> THIS QUARTER ACTIVITIES (First Quarter 2005) <br /> 1 TRC performed quarterly groundwater monitoring and sampling <br /> 2 Submit Quarterly Site Status Report <br /> 3 Prepare and submit a work plan for remedial pilot testing <br /> 4 Received SJCEHD letter approving an SVE pilot test <br /> NEXT QUARTER ACTIVITIES (Second Quarter 2005) <br /> 1 TRC to perform quarterly groundwater monitoring and sampling <br /> 2 Submit Quarterly Site Status Report <br /> 3 Prepare and submit work plan to James Barton with the RWQCB regarding ozone <br /> sparge pilot testing <br /> 4 Complete remedial well installation <br /> 5 Complete 5-day SVE pilot test <br /> CONSULTANT SECOR International, Incorporated <br /> t <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.