My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010571
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2900 - Site Mitigation Program
>
PR0507911
>
ARCHIVED REPORTS_XR0010571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:08:29 PM
Creation date
5/8/2020 11:40:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010571
RECORD_ID
PR0507911
PE
2950
FACILITY_ID
FA0007834
FACILITY_NAME
CIRCLE K #8671
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n r -- <br /> S E C ® R <br /> .I <br /> ranged from approximately 30 feet below ground surface (bgs) to approximately 37 bgs during 2003 <br /> Groundwater flow direction was to the east-northeast at a gradient of 0 001 feet per foot ft/ft during <br /> the third quarter 2003 <br /> In November 2003, SECOR installed deep well MW-8, MW-9, and MW-10 at the site Petroleum <br /> hydrocarbons were not reported in sod and groundwater samples form the new wells Vertical and <br /> lateral delineation of the plume has been completed <br /> RECENT QUARTER ACTIVITIES (Fourth Quarter 2003) <br /> 1 Performed quarterly groundwater monitoring and sampling (TRC) <br /> 2 Prepared and submitted a quarterly summary report <br /> 3 Completed the installation of wells MW-8, MW-9, and MW-10 <br /> NEXT QUARTER ACTIVITIES (First Quarter 2004) <br /> 1 Prepare and submit a quarterly summary report <br /> 2 Perform quarterly groundwater monitoring and sampling <br /> 3 Submit report documenting installation of wells MW-8, MW-9, and MW-10 <br /> CHARACTERIZATION/REMEDIAL STATUS <br /> Soil contamination delineated? Yes <br /> Dissolved groundwater delineated? Yes <br /> Free product delineated? NIA <br /> Soil remediation in progress? No <br /> Start? NIA <br /> Anticipated completion date? NIA <br /> r <br /> CONSULTANT: SECOR International Incorporated <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.