Laserfiche WebLink
S J C O G, Inc . <br /> 555 East Weber Avenue. • Stockton, CA 95202 • (209) 235-0600 • FAX (209) 235-04.38 <br /> Snti Jonrl « iri CourihI Multi- Species Habitat Conservation & Open Space Plrni (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION ( RTLJ ) <br /> ADVISORY AGENCY NOTICE TO SJCOG , Inc . <br /> To . Alisa Goulart, San Joaquin County , Community Development Department <br /> From . Laurel Boyd , SJCOG , Inc . <br /> Date : April 7 , 2020 <br /> - Local Jurisdiction Project Title : PA-2000054 (SA) <br /> Assessor Parcel Number(s ) : 132-080- 12 <br /> Local Jurisdiction Project Number: PA-2000054 (SA) <br /> Total Acres to be converted from Open Space Use : Unknown <br /> Habitat Types to be Disturbed : Urban Habitat Land <br /> Species Impact Findings : Findings to be determined by SJMSCP biologist . <br /> Dear Ms . Goulart : <br /> SJCOG , Inc . has reviewed the project referral for PA-2000054 ( SA) . This project consists of a Site Approval application to <br /> expand an existing activated carbon distribution facility . The project includes a 4 , 250 square -foot expansion of an existing <br /> 6 , 785 square -foot building to be used for storage of materials . The parcel will be served by an existing on -site septic <br /> system , public water service from California Water Service Company , and public storm drain service from County Service <br /> Area No , 17 . The project site is located on the west side of North Wigwam Drive , at the south terminus of North Teepee <br /> Drive , Stockton (APN /Address : 132 - 080 - 1212365 North Wigwam Drive , Stockton ) . <br /> San Joaquin County is a signatory to San Joaquin County Multi - Species Habitat Conservation and Open Space Plan <br /> ( SJMSCP ) . Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts , <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act ( CEQA ) . The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP . Although participation in the SJMSCP is voluntary , Local Jurisdiction / Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP , they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP . <br /> This Project is subject to the SJMSCP . This can be up to a 30 day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible . It is also recommended that the project applicant obtain an <br /> information package . http : // www , ocog . orci <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements : <br /> ■ Schedule a SJMSCP Biologist to perform a pre - construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement : <br /> 1 . Incidental Take Minimization Measures ( ITMIvis) will be issued to the prgject and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six ( 6 ) months from receipt of the ITMMs . If ITMMs are not signed within six months , the applicant <br /> must reapply for SJNISCP Coverage . Upon receipt of signed ITMMs fi*om project applicant, SJCOG , Inc . staff' will sign the ITMMs . This <br /> is the effective date of the ITMMs . <br /> 2 . Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs . <br /> 3 . Upon issuance of fully executed ITNIMs and prior to any ground disturbance, the project applicant must : <br /> R , Post a bond for payment of the applicable SJMSCP ice covering the entirety of the project acreage being covered ( the bond <br /> should be valid Ior no longer than a 6 month per- iod ) ; or <br /> b . Pay the appropriate S .IMSC I' rce for the entirety orthe project acreage being covered , or <br /> C , Dedicate land in - lieu of secs , either as conservation easements or fee title ; or <br /> d . Purchase approved mitigation bank credits . <br /> 4 . Within 6 months from the effective date of the ITMMs or issuance ON building permit, whichever occurs first, the project applicant nnust : <br /> a . Pay the appropriate S .IMSCP for the entirety orthe project acreage being covered ; or <br />