Laserfiche WebLink
STANDARD OPERATING PROCEDURE - <br /> GROLNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory. Prior to sample collection, the type <br /> of analysis to be performed is determined Loss prevention of volatile compounds is controlled and <br /> sample preservation for subsequent analysis is maintained <br /> Prior to sampling,the presence or absence of free-phase hydrocarbons is determined using a MMC flex'- <br /> dip interface probe Product thickness,if present,is measured to the nearest 0 01 foot and is noted in the <br /> field notes In addition, static water level measurements are collected with the interface probe and are <br /> also recorded in the field notes <br /> After water levels are collected and prior to sampling, temperature, pH and electrical conductivity are <br /> measured If purging is to occur,each well is purged a minimum of three well casing volumes of water <br /> using pre-cleaned pumps (stack, suction, Grundfos), or polyvinyl chloride bailers The measurements <br /> are taken a minimum of three Mmes during the purging Purging continues until these parameters <br /> stabilize <br />. Groundwater samples are collected using disposable bailers The water samples are transferred from the <br /> bailer into appropriate containers Pre-preserved c�not available ,the laboratory iied by s instructed to preserve <br /> are used <br /> when possible When pre-preserved containers� <br /> the sample as appropriate Duplicate samples are collected for the laboratory to use in maintaining <br /> quality assurance/quality control standards The samples are labeled to include the job number, sample <br /> identification,collection date and time,analysis,preservation(if any),and the sample collector's initials <br /> The water samples are placed in a cooler, maintained at 40C for transport <br /> t 1 iii Bred to the laborathe laboratory tory. <br /> nce <br /> collected in the field,all samples are maintained under chain of custody until <br /> The chain of custody document includes the lob number,type of preservation,if any, analysis requested, <br /> sample identification,date and time collected, and the sample collector's name The chain of custody is <br /> signed and dated (including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel <br /> A laboratory supplied trip blank accompanies each sampling set For sampling sets greater than 20 <br /> samples, 5%trip blanks are included The trip blank is analyzed for some or all of the same compounds <br /> as the groundwater samples <br /> As requested by Tosco Marketing Company,the purge water and decontamination water generated during <br /> sampling activities is transported to Tosco- San Francisco Area Refinery,located in Rodeo,California <br /> WormAtawo-sop frm-1/98 <br />