Laserfiche WebLink
9255517888 Line 13:03:11 03-10-2014 5/17 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans& applications as originals will be retained by EHD) <br /> 1, Site map enclosed? YES[j NO V <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title B. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Replace two black steel 90's and associated black steel nipples in product line in the diesel sump and the tightening of black steel <br /> pipimginthe 91 turbine ramp <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> Sch.40 standard ASTM A531A53M-12 black steel piping and 90 degree elbows <br /> 2 <br /> Received Time Mar, 10. 2014 12:53PM No. 5384 <br />