Laserfiche WebLink
9255517888 Line 13:04:08 07-15-2013 5/12 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans &applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NOV <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review).- <br /> REPLACE <br /> eview):REPLACE A POSITION SENSITIVE SENSOR(P/N 794380-323) on vent sump <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> VEEDER-ROOT POSITION SENSITIVE SENSOR(P/N 794380-323) <br /> 2 <br /> Received Time Jul. 15, 2013 12: 56PM No. 3591 <br />