My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2012 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 4:03:34 PM
Creation date
5/8/2020 11:48:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2015
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Clearance Form <br /> Contractor Instructions Prior to start of work: 1.Review form,check appropriate boxes,read and sign at the bottom of this forth 2.Inform dealer,manVer or representative of the job to be performed and potential safety concerns and obtaln sl nature <br /> Station k StgVdres ��`iK <br /> 19 �P^.� r Nu j der:� Date: -L-- <br /> T--- <br /> �_ <br /> Contractor Co act Parson in Charge(Print Name) Number of "1 JSA Number: Start Time. End Time: Labor L Travel Time: Travel Miler. <br /> company Name: Gettler Ryan Inc Workers <br /> ProblerNWorkDescription: t�\�dl► ��ac �� � �1�� pp(Z� <br /> F�'1L��.�-��Ca •�^ � Y � `.��� ����� Return Call: Yes/No <br /> Damage Claim: Yes/No <br /> PPE Required(check all that apply and/or fill in"other"blank space <br /> Safety Vest ❑ Hard Hat Shoe&S is <br /> 7V ❑ Hearing Protection Respirator <br /> Protective Clothing nal Gloves Safe Glasses/ les ❑ Fire Resist Clothin Nyeldin PPE Other <br /> (pleaseContractor to complete section below if circumstances on site or specific to this job may generate additional hazards not described in the JSA <br /> back of•..- if additional space -• -• •document) <br /> Task Step Hazards Not Covered b JSA How to reduce or eliminate risk-include extra PPE to be worn <br /> •2 f t�i -' <br /> Work documentation requirements Lower Risk-This form may be used as JSA Medium Risk/Higher Risk-JSA required Higher Risk-JSA Required and other customer requirements may apply <br /> Examples of Higher/Medium Risk Tasks ❑ Works at heights ❑ Work in confined spaces(ex.Tank,interceptor,or manhole entry) <br /> ❑ Trenching or excavating ❑ Hot Work <br /> ❑ <br /> Hoisting/Rigging/Heavy Uffi g LPG system degassing,installation or maintenance <br /> •- . •MWO1141iii1l•. . ... - • .PA -. .- • <br /> contractor representative name St nat • • • • • • • • ctor Si nature <br /> operating sites:to be signed by the site representative Non-operating 7Gene�ralSafety Checks By Contractorsites:to be signed by thecontractor representative Only Has the work area been left tidy and safe? <br /> Contractor responsibility to inform site of: Is the site operator aware of the status of work including any remaining isolation? <br /> 0 Hazards of the job, site reresentative name Si nature Are Changes to equipment ISile-Replesentative Name S' na re <br /> 0 Effects on the site or operation. Co dor has d'Iscusssd JoIxCleArance Forth with me documentation and communicatiun? <br /> 0 Any affect to gasoline deliveries, 0 All incidents,near misses,unsafe <br /> 0 Energy isolation needed, situations reported? <br /> 0 Areas to be barricaded for worker/public safety. Site representative comments: <br /> Parts Ordered,replaced and/or disposed of include model and serial numbers as appropriate) <br /> The contractor through its authorized representative shall sign,issue and be solely responsible for all Job Clearance Forms and the obligations arising there under applicable to work <br /> The farm covers important reminders and is not intended to receive the contractor from safely performing the work in compliance with applicable laws and regulations <br /> The site operator may require the contractor to stop work if it appears that the contractor or any of its workers are failing to comply with the requirements in the applicable items of this forth or other applicable safety regwrernonts <br />
The URL can be used to link to this page
Your browser does not support the video tag.