Laserfiche WebLink
9255517888 Line 12:43:31 12-17-2012 5/13 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans& applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NO V <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Replace sensor S 12. A vacuum sensor for the vent secondary,located in the 87 turbine sump <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> VEEDER-ROOT VACUUM SENSOR <br /> 2 <br /> Received Time Dec. 17. 2012 11 : 37AM No. 1880 <br />