My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2012 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 4:03:34 PM
Creation date
5/8/2020 11:48:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2015
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9255517888 Line 12:44:32 12-17-2012 9/13 <br /> Installation Installing Vac Sensor Housing onto Support Bracket <br /> Installing Vac Sensor Housing onto Support Bracket <br /> Route all of the cables through the opening in the mounting bracket and attach the Vac Sensor housing to the <br /> bracket by pushing the four hooks on the rear of the housing into the four slots in the bracket (see Figure 9) <br /> Vac sensor device Vac Sensor housing STP Riser <br /> connection guide <br /> (use felt pen) ---- <br /> -------------- <br /> L: <br /> ___________ _L T s _ <br /> -------------- <br /> ------------- <br /> D® I <br /> Route cables through Vac Sensor housing <br /> opening in back of support bracket <br /> bracket <br /> Figure 9. Attaching Vac Sensor housing to support bracket <br /> Vacuum Connections within Containment Sump <br /> Vacuum Connections to a Double-Wall Product Line <br /> 1. Get a 1/4" NPT/barbed adapter and spring clamp from the Vac Sensor install kit. <br /> 2. Apply an adequate amount of fresh, UL classified for petroleum, non setting thread sealant (herein after <br /> referred to as sealant) to the threads of the 1/4" NPT barbed fitting and screw it into the 1/4" NPT port in the <br /> vacuum termination fitting of the product line (Figure 10). <br /> NOTE: In some installations,the double-walled piping is equipped with one or more Schrader valves. You can <br /> connect the vacuum tubing directly to the Schrader valve using the Schrader fitting (P/N 576008-672 for <br /> QNorth American installations; P/N 576008-504 for EU installations). <br /> NOTE:any unused Schrader fittings must be capped to avoid leaks. <br /> 3. Get the 1/4" ID tubing from the install kit and measure a piece that will reach the barbed fitting on the bottom <br /> of the plastic valve (see Figure 4) that is connected to the Vac Sensor/Vac Float pair you labeled 'P'. Plan <br /> enough tubing so that it isn't stretched between fittings or have any sharp bends/kinks in it. Cut and install this <br /> tubing and secure tubing ends with spring clamps. <br /> 10 <br /> Received Time Dec. 17, 2012 11 : 37AM No- 1880 <br />
The URL can be used to link to this page
Your browser does not support the video tag.