Laserfiche WebLink
Emergency Shut-Off (ESO) Testing Results & Checklist <br /> Facility Information Contractor Information Test Results <br /> Site# 6080 Co.Name: FASTECH Date:03/12112 <br /> Addr. 85 Louise Ave. Phone: 714-523-0194 <br /> City/St:Lathro ,CA Lead Tech: Isaac Anderson Alltech Petro) ✓ PASS <br /> eMaint.W.O.# 9814211 Name: Isaac Anderson Alltech Petro) or <br /> Pass ort#: B36878 FAIL(Next Day Repair Required) <br /> Signature: <br /> The objective of this test is to provide assurance that when the ESO switch is a v all t f eling system circuits(turbines,and dispensers)are de- <br /> energized,and remain de-energized until they are re-set manually. The test pr(ce ures and guidelines shall be in accordance with the ESO Testing Process. <br /> X To Select <br /> # The following information is to be completed. <br /> Yes No NIA <br /> SITE DATA <br /> 1 Number of ESO s- 1 <br /> 2 Type of Switch Push Pull Monentary111 Plain light/Toggle Other. <br /> if Momentary type,locate and identify re-set button): <br /> 3 Type of Turbine Control Relay System(Electrical Distribution Center): <br /> Brown Box Power Solution Custom Fabricate( :..; Carolina Box ✓ Other <br /> 4 Type of Turbine Control Relays: t✓. Make FE Petro Model ist-VFC <br /> 5 Type of Line Leak Detection: Mechanical ELD/CPT ✓ PLLD <br /> PERFORMANCE TEST <br /> 6 Does the ESO shutdown power to the DISPENSERS? J <br /> 7 Does the ESO shutdown power to the TURBINES? / <br /> Is the 220 voltage to the turbine relay removed (either the line side or the motor side of the contacts or the ✓ <br /> 8 coil)? <br /> 9 Are the DISPENSER BREAKERS clearly identified / labeled? / <br /> 10 Are the TURBINE BREAKERS clearly identified / labeled? / <br /> 11 Are all the ESOs accessible and clearly identified / labeled? ,/ <br /> Did the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts J <br /> 12 or the coil)? <br /> If#12 is NO,briefly describe what was wrong: <br /> 12A <br /> How was it corrected: <br /> 12B <br /> 12C If repair or ESO functionality cannot be corrected same day(prior to leaving the site). The technician MUST notify the <br /> Site Manager of the problem,place an"Out of Service"Tag on the ESO(s),and identify an alternate mean(i.e.,locate <br /> circuit panel,clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> Elite Customer Solution Center has been contacted for the repair. <br /> 12D <br /> eMaint.W.O.Tick <br /> POSTTEST <br /> 11 Site's fueling system is fully operational. ✓ <br /> 12 All equipment secured and any access ports,lids,enclosures are closed. J_ <br /> 13 All safety barricades,and any debris was been removed. J <br /> COMMENTS <br /> Submit completed copy with other documentation in E-Maintenance. <br />