My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2012 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 4:03:34 PM
Creation date
5/8/2020 11:48:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2015
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(�� BP West Coast Products LLC <br /> lJ 4519 Grandview Rd . Bldg. 1 <br /> N� Blaine,WA 98230 <br /> It ��� �'� � <br /> 4& � Phone: (360)371-8111 <br /> Fax: (360)371-1684 <br /> Air Email: sarah.samuels@bp.com APR 91 2014 <br /> EWRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> March 31, 2014 <br /> Inspector Thuy Tran <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton <br /> Stockton, CA 95205-6232 <br /> Subject: Underground Storage Tank Program Inspection Report <br /> Facility #06080 <br /> 85 East Louise Avenue <br /> Lathrop, CA 95330 <br /> Dear Inspector Tran, <br /> This letter is in response to the Underground Storage Tank Program Inspection Report, dated <br /> February 18, 2014, which was issued to the subject facility. Please be advised that the following issues <br /> have been addressed: <br /> Fuel was found at the diesel STP sump, on both side of the saddle, that would total <br /> approximately a cup, insufficient amount to trigger the liquid detection sensors. An <br /> absorbent pad was placed down into the liquid by the technician to confirm it was diesel. <br /> Approximately less than one gallon of liquid was removed from vent sump by technician. No <br /> liquid was observed in the 91 STP but can see old residue of where fuel would have settled. <br /> Several times, Gettler Ryan technicians had to remove liquid from vent, 91 STP and diesel <br /> STP sumps. All primary containment must be impervious to the liquid or vapor of the <br /> substance contained. Immediately have a properly licensed, trained and certified contractor <br /> replace or repair the failed piping under permit and inspection of EHD. Ensure 91 STP, diesel <br /> STP and vent sumps are liquid tight and find source of leakage. Diesel Flex hose was <br /> replaced back on April 2013. If the failed component can't be replaced immediately, there is a <br /> possibility that the 91 and diesel UST system maybe red tagged to prevent fuel inputs. On <br /> February 19, 2014, BP repair and testing vendor, Gettler-Ryan, inspected and cleaned the gaskets <br /> on the 91 and Diesel STP sump lids to ensure a tighter seal. On March 6, 2014, Gettler-Ryan <br /> returned to the site and performed additional inspections of the vent sump, and 91 and Diesel STP <br /> sumps. The vent sump lid was inspected. bolt holes were repaired, and new bolts and washers <br /> were installed to ensure a tighter seal. Repairs requiring a permit were determined necessary for <br /> the 91 and Diesel STP sumps. On March 10, 2014, Gettler-Ryan submitted a permit application to <br /> SJCEHD for the repairs and adjustments needed to the piping in the 91 and Diesel STP sumps. On <br /> March 17, 2014, Gettler-Ryan returned to the site and performed the permitted repairs and <br /> adjustments to the piping in the 91 and Diesel STP sumps. Upon completion of the work, Gettler- <br /> Ryan reported no visible leaks in the 91 product line. In addition, a pressure test was conducted on <br /> the Diesel product line with passing results, which was confirmed in your March 17, 2014 re- <br /> inspection report. Copies of the work orders associated with all vendor work mentioned above, as <br /> well as your March 17, 2014 re-inspection report, are attached for your review and records. <br />
The URL can be used to link to this page
Your browser does not support the video tag.