My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3081
>
2900 - Site Mitigation Program
>
PR0515030
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:25:33 PM
Creation date
5/8/2020 11:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515030
PE
2950
FACILITY_ID
FA0012018
FACILITY_NAME
QUALITY CLEANERS
STREET_NUMBER
3081
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3081 N TRACY BLVD
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emergency Response Facilities <br /> Fire Station: Tracy Fire Station 96 Hospital: Sutter Tracy Community Hospital <br /> 301 Grant Line Road 1420 South Tracy Blvd <br /> Tracy California 95376 Tracy,California 95376 <br /> Telephone: 911 or(209)831-4646 Telephone: 911 or(209)835-1500 <br /> Police: Tracy Police Department Poison Control: Sutter Tracy Community Hospital <br /> 1000 Civic Center Drive 1420 South Tracy Blvd <br /> Tracy,California 95376 Tracy,California 95376 <br /> Telephone:911 or(209)831-6550 Telephone: 911 or(209)835-1500 <br /> Ambulance: Sutter Tracy Community Hospital <br /> 1420 South Tracy Blvd <br /> Tracy,California 95376 <br /> Telephone:911 or(209)835-1500 <br /> DIRECTIONS TO HOSPITAL EMERGENCY ROOM ATTACHED IN APPENDIX A <br /> Air Monitoring <br /> Air quality in the breathing zone will be monitored continuously with a MiniRae2000 photoionization detector <br /> (PID)calibrated to isobutylene. Work will proceed in Level D while PID readings are between 0 and 10 parts per <br /> million (ppm). In the event that breathing zone readings exceed 100 ppm, all personnel will discontinue work at <br /> the location and withdraw from the work area. The appropriate vapor control measures will be implemented(e.g., <br /> application of vapor suppression),the necessary emergency response authorities will be notified, and/or the work <br /> area will be re-sampled until vapor levels are within acceptable levels prior to reentering the work zone. <br /> Please refer to the table below for the Operational Action Levels. <br /> Contaminants Action Level Action to Take <br /> I to 10 PPM Above background at the breathing Level D,continuous air monitoring <br /> zone and sustained for 5 minutes <br /> VOCs 10 to 100 PPM Above background at the breathing Upgrade to Level C, continuous air monitoring and <br /> (PID) zone and sustained for 5 minutes ventilate space <br /> 100 to 300 PPM Above background at the Upgrade to Level B,continuous air monitoring and <br /> breathing zone and sustained for 1 minute ventilate space,or stop work and ventilate <br /> >300 PPM Above background at the breathing Stop work,Evacuate work zones <br /> zone and sustained for I minute <br /> Combustible Less than 10%lower explosive limit(LEL) Continue with caution and air monitoring <br /> Gas in Air (combustible gas monitoring) <br /> (LEL meter) Greater than 10%LEL Stop work, immediately withdrawal personnel,and <br /> ventilates ace with manhole blower <br /> Less than 19.5% Stop work and ventilate or upgrade to Level B <br /> Oxygen in Air 19.5 to 21.5% Level D,continue work with air monitoring <br /> (02 Meter) Greater than 21.5% Stop work, immediately withdrawal personnel, and <br /> evaluate <br /> The PID will be calibrated daily by Partner personnel prior to use. Calibration will be performed in accordance <br /> with the manufacturer specifications and recorded in a log book kept with the instrument. Ambient breathing <br /> space measurements should be collected every 15 minutes. <br /> Partner Site-Specific tlealth and Safety Plan Pogo 3 <br /> Version 1.02 May 4,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.