Laserfiche WebLink
Lpw <br /> GEOMATRIX <br /> 7.0 BASIS FOR RECOMMENDATIONS <br /> The recommendations made in this report are based on the assumption that soil conditions at <br /> the site do not deviate appreciably from those described herein and encountered in the <br /> exploratory boring. If any variations or undesirable conditions are encountered during <br /> construction, Geomatrix should evaluate the effects these conditions may have an our <br /> recommendations and, if necessary, develop supplemental recommendations. Recommenda- <br /> 16* tions are made for the specific project described in this report. Changes in design of the <br /> structures should be evaluated by Geomatrix for their effects on these recommendations. <br /> A Geomatrix representative should observe earthwork and foundation construction to confirm <br /> that subsurface conditions encountered during construction are comparable to those used for <br /> developing the recommendations presented in this report. Unanticipated subsurface conditions, <br /> which cannot be disclosed fully by drilling and sampling boreholes, commonly are encountered <br /> Lo and frequently require additional expenditures to attain a properly constructed project. Some <br /> contingency funding is recommended in case conditions encountered during construction <br /> ,., require additional exploration, testing, or design modifications. <br /> LN In the performance of our professional services, Geomatrix, its employees, and its agents <br /> comply with the standards of care and skill ordinarily exercised by members of our profession <br /> practicing in the same or similar localities. This report may not provide all of the subsurface <br /> information that may be needed by a contractor to construct the project. No warranty, either <br /> express or implied, is made or intended in connection with the work performed by us, or by the <br /> i. proposal for consulting or other services, or by the furnishing of oral or written reports or <br /> findings. We are responsible for the conclusions and recommendations contained in this report, <br /> which are based on data related only to the specific project and location discussed herein. In <br /> the event conclusions or recommendations based on these data are made by others, such <br /> conclusions and recommendations are not our responsibility unless we have been given an <br /> opportunity to review and concur with such conclusions or recommendations in writing. <br /> +- $.0 REFERENCES <br /> Geomatrix Consultants, Inc., 1993, Seismic ground motion study for San Joaquin River- <br /> Antioch Bridge, Contra Costa County, California, Contract No. 59N772: Final Report <br /> Prepared for the California Department of Transportation. <br /> `a Standard Specification for Public works Construction (latest edition) Published by BNL <br /> Building News, Los Angeles, California. <br /> I:IProject15000s153131LE WI S-MAN.DOC <br /> 13 <br />