Laserfiche WebLink
I:_ 4-k—L .. a. <br /> OIL SPILL CONTINGENCY PLAN <br /> B.1. Purpose <br /> This Oil Spill Contingency Plan is prepared in accordance with 40 CFR 112.7(d) to <br /> address areas of the Maxim Crane Works facility in Stockton, California where secondary <br /> containment does not yet have sufficient capacity to contain releases entirely, as documented in <br /> the facility Spill Prevention, Control, and Countermeasure (SPCC) Plan. <br /> The purpose of this Oil Spill Contingency Plan ("Contingency Plan") is to define <br /> responsibilities and procedures for responding to releases of oil from the Maxim Crane Works <br /> facility that may potential reach navigable waters or adjoining shorelines of the United States. <br /> The Contingency Plan is implemented whenever a discharge of oil has reached, or threatens, <br /> navigable waters or adjoining shorelines. <br /> This plan will be reviewed and immediately amended whenever any of the following <br /> occurs: <br /> • The applicable regulations are revised (i.e., 40 CFR 109 and 112); <br /> • The plan fails in an emergency; <br /> • The facility changes in its design, construction, operation, maintenance, or other <br /> circumstances in a way that materially changes the potential for releases of oil; <br /> • The list of emergency coordinators changes; or <br /> • The list of emergency equipment changes. <br /> Copies of this plan have been distributed to appropriate personnel within Maxim Crane <br /> Works. <br /> B-2 <br />