Laserfiche WebLink
CONTENTS <br /> Page <br /> I. INTRODUCTION ................................................................................................................... 1 <br /> A. Purpose............................................................................................................................. 1 <br /> B. Applicability(40 CFR 112.1).......................................................................................... 1 <br /> 11. PLAN ADMINISTRATION....................................................................................................2 <br /> A. Management Approval and Designated Person...............................................................2 <br /> B. Professional Engineer Certification(40 CFR 112.3(d))..................................................2 <br /> C. Plan Location(40 CFR 112.3(e)).....................................................................................3 <br /> D. Plan Amendment by Regional Administrator(40 CFR 112.4)........................................3 <br /> E. Plan Review and Update (40 CFR 112.5)........................................................................3 <br /> F. Cross-Reference with SPCC Provisions (40 CFR 112.7)................................................6 <br /> G. Conformance with Applicable Requirements (40 CFR 112.7(a)(1))...............................6 <br /> III. GENERAL FACILITY INFORMATION...............................................................................8 <br /> A. Facility Description (40 CFR 112.7(a)(3)) ......................................................................8 <br /> B. Oil Storage (40 CFR 112.7(a)(3))....................................................................................9 <br /> IV. GENERAL REQUIREMENTS FOR SPCC PLANS (40 CFR 112.7).................................. 11 <br /> A. Evaluation of Discharge Potential (40 CFR 112.7(b))................................................... 11 <br /> B. Secondary Containment (40 CFR 112.7(c)) .................................................................. 12 <br /> C. Contingency Planning(40 CFR I I2.7(d))..................................................................... 13 <br /> D. Inspections, Tests,And Records (40 CFR 112.7(e)) ..................................................... 13 <br /> E. Employee Training And Discharge Prevention Procedures (40 CFR 112.7(f)) ............ 14 <br /> F. Security(40 CFR 112.7(g)) " <br /> G. Loading And Unloading(40 CFR 112.7(h)).................................................................. 16 <br /> H. Brittle Fracture Evaluation(40 CFR 112.7(i))............................................................... 17 <br /> I. Conformance With State Requirements (40 CFR 112.70)) .......................................... 17 <br /> V. DISCHARGE PREVENTION MEASURES (40 CFR 112.8).............................................. 19 <br /> A. Facility Drainage (40 CFR 112.8(b))........................................ ...................... 19 <br /> B. Bulk Storage Containers (40 CFR 112.8(c)).................................................................. 19 <br /> C. Facility Transfer Operations (40 CFR 112.8(d)) ...........................................................21 <br /> VI. CERTIFICATION OF NO SUBSTANTIAL HARM (40 CFR 112.20(e))...........................23 <br /> -ii- <br />