Laserfiche WebLink
SPCC Amendment Number 1 <br /> Description of amendments 9 <br /> 1) Changes to the Branch Manager status 10-9-12 j <br /> 2) Addition of contact information for clean-up contractors 10-9-12 <br /> SPCC Amendment Number 2 <br /> 1) Chan es to the Branch Manager Status 10-29-15 <br /> SPCC Amendment Number 3 <br /> 1) Plan Review 6-4-19 <br /> 2 Chanize to Service Manager/Shop Manager/ShopForeman Status Servando Pineda is the new Service Mana er <br /> 3) Removed AST#5 275 gal tank from plan (transmission oil) <br /> 4) Removed gear oil drums (165-011 <br /> 5) Chan ed AST#4 Hydraulic oil capacity from 600 to 165 al <br /> 6 Chan ed AST#3 engine oil Capacity from 574 to 400 gal <br /> 7 Changed total capacity in TABLE 3 to 11,730 gal <br /> u <br /> SPCC Amendment Number 4 <br /> 1) Plan Review 5-14-20 <br /> 2 Removed 10 000 AST Diesel tank from the property. Awaitin ac uisition of replacement tank <br /> 3 Changed total capacity in TABLE 3 to 1,730 gal (pending acquisition of replacement 10,000 al AS <br /> 4 Pressure test conducted 3-10-20 on underground lines waste oil by Dunlee Pum in <br /> Management Approval <br /> This amendment to the SPCC Plan has the full approval of Maxim Crane Works management. Maxim <br /> Crane Works has committed the necessary resources to implement the measures described in this amendment. <br /> Shop Supervisor Signature Name (printed) Date <br /> Professional Engineer Certification <br /> The undersigned Registered Professional Engineer is familiar with the requirements of 40 CFR 112 and <br /> has visited and examined the facility, or has supervised examination of the facility by appropriately qualified <br />