My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2900 - Site Mitigation Program
>
PR0518209
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 2:12:14 PM
Creation date
5/8/2020 2:00:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518209
PE
2950
FACILITY_ID
FA0013759
FACILITY_NAME
PACIFIC BELL
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
02
SITE_LOCATION
10 E 12TH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTHtEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K. eran,HR.E.H.S. Carl Borgrnan,R.E.H.S. <br /> ;� 304 East Weber Avenue, Third Floor <br /> N , Director Mike Huggins,R.E.H.S.,R.D.I. <br /> AI Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> �Q;L.lrtF oa�P Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. Fax: (209)464-0138 Robert McClellpn,R.E.H.S. <br /> Program Manager Mark Barcellos,R.E.H.S, <br /> CESAR CRUZ C/O KATHERINE HALLIGAN FILE COPY <br /> PACIFIC BELL <br /> 947 LINCLON RD <br /> STOCKTON CA 95207 <br /> WORK PLAN: "Work Plan for Well Installation Activities" <br /> DATED: April 2003 <br /> PREPARED BY: IT Corporation — Rob Delnagro <br /> STATUS: APPROVED with Conditions noted below. <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S <br /> 25299.37 subd(c)(3)1: <br /> Install three (3) first groundwater, 2" PVC, monitoring wells onsite <br /> and, <br /> • Analyze selected soil samples (at least two per boring) for TPH as <br /> diesel (8015m), BTEX, (8020), and MtBE (8020) and, <br /> Develop, survey, and quarterly monitor and sample wells and, <br /> Submit report of findings to EHD in a timely manner. <br /> COMMENTS AND CONDITIONS: <br /> • MtBE analysis for selected soil samples to be analyzed by EPA <br /> Method 8260B only. Method 8020 not acceptable and, <br /> Submit an EHD Well Permit Application form and $89 fee and, <br /> Make appointment for drilling with at least 48-working hour notice. <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN FH&S 25299.37 <br /> subd(c)(3)1: <br /> none <br /> DATED: May 15, 2003 BY: �6 �p <br /> Michael Infurna, S for REHS (209) 468-3454 <br /> [ X ]Faxed to consultant on: <br />
The URL can be used to link to this page
Your browser does not support the video tag.